My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2103
>
3500 - Local Oversight Program
>
PR0544591
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 2:38:17 PM
Creation date
6/21/2019 11:32:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544591
PE
3526
FACILITY_ID
FA0005220
FACILITY_NAME
CHEVRON #9-4054
STREET_NUMBER
2103
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308029
CURRENT_STATUS
02
SITE_LOCATION
2103 COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ 98STOCK3.EST <br /> SUMMARY REMEDIAI1*aT PfiE1F'C?$ € FORM — t <br /> Terra Vac Project #:30-0212 _— -- <br /> _ <br /> Former Chevron Station 9-4054 — — — — <br /> 2103 Country Club Road -- — —� <br /> Stockton, California _ Total project cost $221,886 <br /> Chevron POC Brett Hunter <br /> Labor"Rates arsd €rlformaiiarr S99Vehicle $75 <br /> Project Manager $50 <br /> Supervising Engineer 5137 Phone _. <br /> Chemist $72 Per Diem 5100 <br /> Senior Geologist $93 <br /> Geologist $73 <br /> Engineer $78 <br /> Technician $50 <br /> Mark-up -- 1.15 <br /> Fixedr r! Task Phase <br /> . <br /> z9r.,ay.Osh9<'a.'<e.hio-c£;... ... ... {y Total SU total <br /> A OXY < j b >O nOJOi" . W.A P M}).v�. � <br /> TASK 1: Work Plan & Regulatory Negotiation <br /> Subtask 1: Complete File Review 10 $99 $990 <br /> Subtask 2: Regulatory Negotiation 40 $99 $3,960 <br /> Subtask 3. Remediation Work Plan 10 $73 $730 <br /> Subtask 4: Meetings with RP 0 5 $99 $495 <br /> Subtask 5: Meetings with Regulators 0 20 $99 $f,980 <br /> ODC $0 <br /> TOTAL TASK 1 $8,155 <br /> TASK 2: Engineering, Permitting, Reporting <br /> Subtask 1: Additional File & Data Review 5 $99 $495 <br /> Subtask 2: Remediation System Design $2,574 <br /> calculation of extent of hydrocarbons 1 $78 $78 <br /> preparation of project schedule 1 $78 $78 <br /> utility design 20 $78 $1,560 _ <br /> construction bid specs. 8 $78 $624 <br /> drafting 3. $78 ___$234 <br /> Subtask 3: Permitting $4,788 <br /> Building 2003 $78 $434 — <br /> Electrical 100 2 $78 $256 <br /> Air 100 8 $72 $685 <br /> Water 30 $73 $2,190 _ <br /> Well/ Boring 89 10 $73 $827 <br /> Permit Review 4 $99 $396 <br /> Subtask 4: Health & Safety Plan 4 $73 5292 $292 <br />
The URL can be used to link to this page
Your browser does not support the video tag.