Laserfiche WebLink
98STOCK3.EST <br /> Fined Task Phase <br /> Costs Units Rate Total Total $582 Subtotal <br /> Subtask 5: Reporting – 4 $99 $396 <br /> Preparation - Project Manager 2 $93 $186 _— <br /> Review _ <br /> Subtask 6: Meetings/ Reporting with Chevron <br /> 4 $99 $396 <br /> ---- 8 $99 57921 <br /> Subtask 7: Follow-up with Regulators <br /> bC - —� $9,919 <br /> TOTAL TASK 2 <br /> TASK 3: Remedial System Installation -- -- --- <br /> Subtask 1: Drilling $51,330 <br /> Wells (Number, Depth, $/foot) 20 30 $45 531,050 subcontractor <br /> TPH/BTEX soil sample, lab costs 20 6 $55 $7,590 _ <br /> Petrophysical Analysis - soil4 $165 $759 <br /> Well vaults 20 $100 52,300 <br /> Underground Locator Service 300 3 $50 $518 subcontractor <br /> Geologist drilling 70 $73 $5,110 <br /> Well log drafting 25 $73 $1,825 <br /> Reporting (drilling) 5 $73 $365 <br /> Vehicle 7 $75 S525 <br /> Phone 7 $50 $350 <br /> Travel Time (trips`hrs•rate) 2 3 $73 $438 - <br /> per diem 5 $100 $500 <br /> Subtask 2: Construction $22,203 <br /> PVC Pipe & Fittings (total) 3500 8 $50 $4,485 <br /> Instrumentation (#wells, $) 20 $50 $1,150 <br /> Sound wall Material 1000 0 $75 51,150 <br /> Control panel, electrical 5000 8 $78 $6,468 subcontractor <br /> _Fork lift Rental (days*rate) 1 $300 $345 _ <br /> Labor - Technician <br /> Trenching Supervision 0 $50 $0 <br /> Manifold System Construction 60 $50 $3,000 <br /> Fence installation & supervision 2000 4 $50 $2,200 subcontractor <br /> Soundwall construction 10 $50 $500 <br /> Trailer/ Phone Installation 3 $50 $150 <br /> _ Engineer 5 $78 $390 _ <br /> Project Manager 10 $99 $990 <br /> Vehicle 7 $75 $525 <br /> Phone 1 $50 $50 <br /> Travel Time (trips•hrs'rate) 2 3 $50 $300 <br /> Per Diem 5 $100 S500 <br /> Page 2 <br />