Laserfiche WebLink
98STOCK3.EST <br /> Tined Task Phase <br /> Costs. Units_. Rate Total Total Subtotal <br /> PHASE 4:Operations and Maintenance --- <br /> T_ask 1: Operations (cost/week) <br /> Rental <br /> _ -- --_ 1 $310 $310 <br /> Extraction Unit — -- -- " <br /> — 1 $1,027 $1,027 <br /> Vapor Abatement Unit _ _ - --- --- <br /> Injection unit 1 $150 $150 <br /> K/O pot/water pump _—_—_- $ <br /> 0.5 $75 $38 <br /> -- Sample_Pump.,PID _ _ -- ----- <br /> Labor — <br /> Technician 6 $50 $300 <br /> Engineer 1 $78 $78 — <br /> Chemist 0 1 $72 $72 - -__-- <br /> Project Manager 3 $99 $297 - <br /> Electric 1 $400 $400 <br /> Vehicle - 0.5 $75 $38 <br /> Phone 0 $50 $0 <br /> Travel Time (trips*hrs"rate) 1 3 $50 $150 <br /> analytical, discharge 0.25 $150 $38 <br /> Total Catox ops, 20 weeks 20 $2,997 $59,930 <br /> Total Carbon ops, 10 weeks 10 $1,308 $13,080 <br /> Reporting Monthly $4,890 _ _ -__- <br /> Preparation - Project Manager 40 $99 $3,960 <br /> Review 10 $93 $930 <br /> ODC $0 <br /> TOTAL SUBTASK 3 _ $77,900 <br /> Page 4 <br />