Laserfiche WebLink
98STOCK3.EST <br /> Fixed Task Phase <br /> . .Costs. Units Rate Total Total Subtotal <br /> PHASE 5: Interim System Performance Evaluation _ <br /> Task 1: Interim Borings $9,319 <br /> Planning 4 $78 $312 <br /> Wells (number,depth,$/ft) 3 30 $50 $5,175 <br /> Well vaults 3 $100 5345 - <br /> geologist drilling 15 $73 $1,095 —well log drafting 5 $73 $365 <br /> -Vehicle 2 $75 $150 <br /> Phone 0 2 $50 $100 <br /> Travel Time (trips'hrs*rate) 2 3 $73 $438 <br /> per diem 2 $100 $200 <br /> analytical 3 6 $55 $1,139 <br /> Task 2: Construction $2,063 <br /> PVC pipe and ftgs 500 2 $50 $690 <br /> Instrumentation(#of wells,$) 3 $50 $173 _ <br /> Labor <br /> Technician 15 $50 $750 <br /> Electric 0 $500 $0 <br /> Vehicle 2 $75 $150 <br /> Phone 1 $50 $50 <br /> Travel Time (trips*hrs*rate) 1 3 $50 $150 - - <br /> per diem 1 $100 $100 <br /> Task 3: Reporting $582 <br /> Preparation-Project Manager 4 $99 $396 <br /> Review 2 $93 $186 <br /> Task 4: Meetings with Regulators 4 $99 $396 $396 <br /> Subtotal Phase 5 $12,359 <br /> Phase 6: Closure Activities,Demob, Final Report <br /> Task 1: Closure Activities $19,299 <br /> Planning 8 $78 $624 <br /> Confirmatory Borings (number,depth,$/ft) 3 30 $35 $3,623 <br /> geologist drilling 10 $73 $730 <br /> well log drafting 5 $73 $365 <br /> Well destruction (number,depth,$/ft) 23 30 $15 $11,903 <br /> Vehicle 3 $75 $225 <br /> Phone 0 1 $50 $50 _ <br /> Travel Time (trips*hrs*rate) 2 3 $73 $438 <br /> per diem 1 $100 $100 <br /> - ----------- <br /> analytical costs 3 6 $60 $1,242 <br /> Task 2: Site Demobilization $2,292 <br /> Labor <br /> Technician 20 $50 $1,000 <br /> Project manager B $99 $792 <br /> Vehicle 2 $75 $150 <br /> Phone 0 0 $50 $0 <br /> Travel Time (trips*hrs*rate) P e 5 3 $50 $150 <br /> per diem flo <br />