Laserfiche WebLink
. • r r r <br /> $ Roof Access Ra ae�irs _ Mcallaneous Structural Repairs <br /> -_ BP Logistics _. Expense _ Stairs I Gantry f Platfarms <br /> CAPEX - REVEX ,PS STDOI-E.TK STAR <br /> The existing caged ladder is wminglee wdh the existing roof handrails resulting in an awkward and unsafe access <br /> the fixed roof The existing handrails and the top part of the caged <br /> ladder shall be modified to widen the ' <br /> passage way from the ladder to the fixed roof to provide safe and convenient access to the fixed roof.The existing <br /> handrails shall be modified as required to completP,�work _ (CHANGE-Rev.1) <br /> C <br /> Fixed Roof Handrail Repairs rteseellaoeous Structure Repairs <br /> -_BP Logisttcs Expense I _ Stairs I Garary I Platforms <br /> _ CAPEX - I REVEX P5_STD01-ETKSTAR <br /> The existing fixed root handrslis are bolted to the top angle The south and west handrail posts have base holes <br /> that are open to the tank which permits emissions to leak out and moisture to penetrate Inside The existing <br /> handrails shall be modified to replace all the bolted bearing pads on the bottom of the handrail posts with new 1/4' <br /> thick minimum 6•diameter A-36 plate that is seal welded all around with a full and complele 3116'fillet weld The <br /> Lonew bearing pads shall be sized and positioned to campfetely cover any existing boll hales through the roof plate <br /> rthe top anole _ <br /> _ -7-- J—__�' <br /> y rAccess Ladtler Renalrs <br /> --s _ Miscellaneous Structural Repairs <br /> BP Lo istiea <br /> __g 6 Expense _ StairslGantry/Platforms <br /> CAPEX REVEX ' P5-STDOI-E TK STAR <br /> There is no safety chain or drop bar at me lop-&-the access ladder onto the rixetl roof.A safety drop bar or chem <br /> shall be I IStallec at the JoP o(the access ladtler <br /> xl New Thermal Relief Assembly <br /> BPL (stirs Ex nsa _ �_i__ — <br /> °—V—- - Pe.�. �e All Other Y Built Items <br /> CAPEX - REVEX J P5STD01-E-TK'1BLD <br /> One(1)new 7 Shell Nozzle(Thermal Relief)shall be installed near the existing niet nolle. K2 Schedule 60 <br /> 1508 R.F. Long Weld Neck Flangehorcofe shall be installed in the lank shell adjacent to the product nozzle The <br /> installation shall comply with API-650 Figure 5-6 weld spacing requirements A 2 sockolet shall be installed on <br /> ,.product line on the"pipeline"side of the tank valve. <br /> f'[below. <br /> ew PI a Su ort _ t <br /> BP Lopieties IExpense \ All Other Bulit items <br /> CAPEX - REVEX j PS-STD0I-E TK IBLD <br /> here is a 2'check valve connected the bogom inlet gate valve with a threaded gange.The piping to these valves <br /> s no support.The threaded llange shall be seal welded and a new pipe support shall be installed as shown <br />