My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE: I <br /> 3. After all repairs are completed,the repair contractor shall submit a final repair documentation package to the <br /> Tank Coordinator and Tank Specialist. <br /> 4. A copy of all material lest reports(MTRs)is required.The BP Tank Group will review and document <br /> 5. All welder qualifications,Welding procedure Specifications,and Procedure Qualification Records shall be <br /> submitted to the BP Tank Group prior to starting work for approval and documentation. <br /> 6. Contractor shall provide as built drawings and forward to the Tank group.(Ex:floating roof seal,bottom <br /> patch and weld repair layout,replaced shell nozzles.etc.) <br /> 7. Repair contractor shall field verify all dimensions before beginning fabrication. <br /> 1. Operations shall contact the Tank coordinator when the lank Is ready to be cleaned. <br /> 2. After the tank is emptied,LOTO shall be written and submitled by the Operations/Maintenance <br /> 3. Tank shall be de-gassed by special means(vapor combustion,vapor recovery,carbon filter processing, <br /> chemical additive)if required by Federal Regulations or local requirements. <br /> 4. Tank shall be opened and contractor cleaning company shall remove remaining lank bottom sediment. <br /> 5. Any leftover solid material shall be tested and placed in segregated roll-off boxes.Boxes shall be provided by <br /> Heritage and testing 8 disposal will be arranged by Heritage. <br /> 6. Tank cleaning shall Include removal of water,oil,and debris from floating roof.tank bottom,and lower shell. <br /> Ir. 1 <br /> 1, Tank#7 will require an API 553 Out-of-Service inspection after the lank is cleaned.The inspection shalt be <br /> completed in accordance with API 653 and BP Plpeines Inspection guideline. <br /> 2. The Initial Inspection shall be performed by BP designated con[met inspectors. <br /> 3. Settlement survey of perimeter shell and internal bottom shall be performed. <br /> 4. The internal bottom.shelf,welds,bottom side of floating roof,and all internal components shall be Inspected <br /> 5. UT thickness readings shall be obtained on the bottom,cons roof,shell,and nozzles <br /> G. A revision to this Job Note shall be generated after the inspection results are reviewed, <br /> 7. A schedulelbmeline shall be made after Job Note is defined. <br /> External and Internal pictures <br /> • • •• Alter tank Is completed ext net and internal pictures shall be taken far future records. <br /> Date:. <br /> Job Representative Signa .iep shall have a copy on site.(initial -- ) <br /> Inspection report) U;/- <br /> API 653 Inspector g ure: Inspector sh 1 make sure a copy of the initial Date: <br /> inspection in at t e. �� <br /> Ultrasonic Thickness Readinas(BP Inspection) <br /> • . •• SP authorized inspector shall take IJ,T+thickness readings on floor,shell,all nozzles,and reef. <br /> ' Date: <br /> Job Representative Signature:Joy'/ sh h e a copy an site.Initial <br /> Inspection report) <br /> API 653 Inspector Signature-Xi; ctor shall make sure a coijy of the initial Date: <br /> inspection in at the site i � .,�—l" , -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.