Laserfiche WebLink
-- -- , <br /> Sfrepping �r <br /> • . •.• After all repairs are completed/tank be s p A copy of the strapping ahail be sent to <br /> operations,engineer and inspection departinwOate: G/Z��eJob Representative Signature:Job Ra copy on site.(Initial <br /> Inspection report) <br /> API 653 Inspector Signature:Inspector shall make sure a copyof the initial Date: <br /> inspection in at the site <br /> Post Repair Inspection <br /> After ell repairs are performed a post-repair inspection shall be performed by the Inspection Contractor that <br /> performed the initial inspection.The post-repair inspection::hall include inspection of all items identr6ed as <br /> requiring repairs in the Initial Inspection.A Post-Repair Kdeclion Report shall verify that all repairs were <br /> completed and that the lank is fit to return to service. <br /> ��> Date: <br /> Job Representative Signature:Job Rep }I�tan site.hnitial /s���� <br /> Inspection report) y rr�� C <br /> API 653 Inspector Signature: Inspncte/s II maks sure a copyof the initial pate: <br /> inspection in at the site <br /> Wrap-Up(Final Walk Through) <br /> When this Job Note and all revisions are complete,Operations and the Tank Coordinator shall field verify that all <br /> items listed In this Job Nate and revisions are satisfactorily completed and that all housekeeping Is completed. <br /> The final walk through checklist shall be completedbl�ferties. <br /> Date: <br /> Job Representative Signature:Job RrN.Oshe has completedantl accepted all Items in this p61V0 <br /> Return to Sarvlca Checklist <br /> The Retum to Service Checklist shall be comp the tank is ready to return to service and that tank <br /> Is operating as expected upon Initial return to service. <br /> Date: <br /> Job Representative Signature:Job Rep shall Ife/she has completed <br /> and accepled an ticros in this package <br /> Preca ipnary Work <br /> r •�jit ( l : Irl r; tit � 1 �iir«L� rj iJ; - Itr 'fr'r-1,r 41`1 <br />