Laserfiche WebLink
1 ' <br /> 1. The existing gauge float guide wires hold down bar is not seal welded to the tank bottom. A cable <br /> attachment pad shall be seal we'ded to the bottom under the gauge float. <br /> 2. The pad plate shall be minimum 12"larger than the distance between the Cables x 12"wide x 114°thick A-36 <br /> Modified steel plate.Lugs,with holes for attachment of the cables,shall be welded to the pad. <br /> 3. Position the ad plate under the gauge goat cables. <br /> 4. MNE The correct position of the pad shall ver' ied by a BP representative <br /> Dater <br /> Job Representative Signature:Job Rep s I si ✓tar he/she has completed l � �/« <br /> verification- <br /> 5. <br /> l.+ <br /> 5. The pad plate shall be installed as follows: <br /> a. Clean area what e pad plate is to b Inst led. <br /> b. Weld pad plate over marked are uInzmg E701B electrodes,% full fillet weld. <br /> C, Clean off completed weld. <br /> J. • • •• All welds Shall be visually inspected by a BP representative. <br /> Date: <br /> Job Representative Signature:Job Rep shall vis y ins t after work Is <br /> Completed. Job Rep shall sign off each tlay It t'E pta�� 5/�-7/(U <br /> API 553 inspector Signature: Inspector shaJtI ver'I Ithe Jo efe has signed Dale_ <br /> off the above ilem then Inspector can sigrfof(. t t.,✓ <br /> a, • r •• Final welds shall be Dye Pe�lrant examined by E contractor and witnessed by a BP <br /> representative. <br /> Job Representative Signature:Jab Rep sna}�v ua11 spect after work is Date: <br /> Completed Job Rep shall sign o(f.Be tlay ac of <br /> API 653 Inspector Signature: Inspocto she perform rail NDE if acce `le Date: <br /> then it can be sign off. <br /> OEM=- , All welds shall be vacuum box test by the repair contrac r and witnessed by a BP <br /> representative. <br /> Job Representative Signature:Jab Rep sh w an spact after work Is Date: <br /> completed. Job Rep shall sign off aach y i Cc able, J//�) (0 <br /> API 653 Inspector Slanatum: Inspector hall dorm requ red NDE if acceptable Data: <br /> then it can be sign off <br /> 6 Theuide wires shall be attached to the lugs on the pad. <br /> 7 The complete work shall be visually inspected by a BP representative. <br /> • •• Dale: <br /> Job Representative Signature:Jab Rep shall v)s-1911y p} act after work is <br /> completed Job Rep shall sign off each dayA a,R:eept in <br /> / f fr <br />