My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
API B53 Inspector Signature: Inspector shall verify that thb Rep has jigned Date: <br /> off the abo•a item then Inspector can signotf. k ? � )Ila <br /> Discharge Shell Nozzle Replacement )(/ <br /> (ITEM 41 CODE 3)(ITEM 91 CODE 5) <br /> 1. The existing 2`Shell Coupling"I"(Discharge)does not have adequate weld spacing in compliance with API. <br /> 653 minimum weld spacing requirements. The existing threaded coupling shall be removed and replaced <br /> with a new 2"flanged shell nozzle In the same location.The new 2"ANSI 150*Flanged low profile shell <br /> nozzle shall be as shown below. The installation shall comply with API-853 and API-650 weld spacing <br /> requirements.The installation shall comply with API-650 Figure 5.6. Note:The 2"flanged nozzle maybe a <br /> 2"lo weld neck flange noufe. <br /> 2 • r '• The BP representative shall documen record the horizontal and vertical weld spacing for <br /> Iha new reinforced 2`flanged nozzle installation. a Id c .m all not be less than that shown in the <br /> drawings. � � <br /> Date: <br /> u <br /> Job Representative Signature:Job Rep, alls! off after holshe has <br /> completed <br /> 3 All material specifralions shall be in ccordence with API-650 Figure 4.1 thickness for design metal <br /> temperature as derived from Figure 4-2.Ali material shall meet the Impact testing and toughness <br /> requirements of API.650. <br /> 4 The 2"flanged nozzle shall be installed in accordance with API-650 Figure 5-8 and Tables 5-6,5-7 and 5.8. <br /> The shell-to-nozzle weld shall be complete and full penetration.The nozzle neck shall be welded on both <br /> inside and outside of the lank shell.The Initial weld shall be completed,back-gouged and inspected,final <br /> weld shall be completed. <br /> 5. Paint shall be removed from the area where cut out i5 to be made. <br /> 6 The lank shall cut out shall match that of the nozzle size with proper allowance for weld fit-up in accordance <br /> .flb the a roved welding procedure.The nozzle shall be tacked in place. <br /> 7. • • The fit-up of the nozzle shall be visually inspected(VT)by a BP representative for compliance <br /> wish the approved welding procedure. <br /> Date: <br /> Job Representative Signature:Joh Rep shall v' Ilype/. after work is <br /> completed. Job Rep shall sign off each day ce 1a C�_ /GJ <br /> API 663 Inspector Signature•.Inspector s ally dyth tthe Job RRephassigrsd Data: <br /> off the above dem then Inspector can si note ` �/7//0 <br /> 8 All rrozzie-to-shell welding shall be full fillet welded complete fusion an mplets penetration utilizing E7018 <br /> electrodes The nozzle shag be welded both internally and externally I fillet size shag be as shown in the <br /> attached drawing. <br /> 1 Nozzle-to-Shell Weld Testing and Inspection. <br /> a. • r '• The completed initial shalt be visually Inspected(VT)by a EP representative. <br /> Date: <br /> Job Representative Signature:Job Rep v;_.I;fisu�fy inspect after work m <br /> completed. Job Rep shall sign off each,dav'if gCf'ep Is <br /> s �7 <br /> L. ..- .I N � �4,A r til'. C �'-•r:l �!l-r i�5h �l���g��'-.�'�_I <br />
The URL can be used to link to this page
Your browser does not support the video tag.