Laserfiche WebLink
LOAM 5/2412010,8:45 <br /> Date: <br /> Job Representative Signature;Job Rep shall visa trap after work is <br /> completed. Job Rep shall sign off each day if ��ta�� <br /> API 653 Inspector Signature: Inspector shat enf ha e JoRep has signed &/'7//(? <br /> Da <br /> Date- <br /> off the above item then Inspector can sign ff. <br /> C. • 1 • The completed welds shall be Magnetic Particle exam a (MT)by NDE contractor,both <br /> intenor and exterior,and witnessed by a Ble r area a. <br /> Job Representative Signature:Job Rep shall " loll c after work is Date: <br /> completed. Job Rep shall sign off each d, i aka bl p �� /� <br /> Ago, <br /> API 653 Inspector Signature: inspectohall dorm required E if acceptable Data: <br /> then it can be sign off. ."l {r <br /> e • • '• PII areas shall be visually inspected(VT)bbt)yaaa BB`)P'repCrreesent N, <br /> Date: <br /> Job Representative Signature:Job Re 11 v' ally i pact after work Is <br /> competed. Job Rep shall sign off a ay d cc Is. <br /> / � 7 <br /> API 053 Inapechn 6t911a1Lum:Hist'.cl U/�shall verity Thal t e Job Rup s signed Data: <br /> off the above dem then Inspectpr cap signoF[, f ql &/? <br /> 6/ <br /> 14 The inside edge of the socket weld fittings shall be weld prepared with a :r mbar before assembly.The fit-up <br /> of all ni les into the socket weld fittings shall include a 118"internal gap at the bottom of the socket. <br /> 15. 013-- The Fit-up of the piping Inside socket weld filling shall be visually inspected by a BP <br /> representative for compliance with the approved welding procedure <br /> Date: <br /> Jab Representative Signature:Job Rep II dal y i pect after work is <br /> completed. Job Rap shalt sign off ac a- blc. �7(/ <br /> �L <br /> API 653 Inspector Signature:Insp�cto shaliverifyt at eJob Rep a�signed Date: <br /> off the above item then InspectgF I storrid. (�/ 61/7110 <br /> 16 AJI socket welds shall be a minimum of 2 pass and no more than 3 passe f ILfillet mid all around utilizing <br /> E6010(root)and E7018(cap&fill)electrodes. <br /> 17 Socket Weld Testing and Inspection. <br /> a. "�'"• 1 The weld root pass shall be visually inspected(VT)by a BP representative. <br /> / Date: <br /> Job Representative Signature:Joh RII vipecl after work is <br /> Lmpleted. Job Rep shall sign off each' y it a le. <br /> o <br /> i� <br />