My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fa3. CYT ialIT-i <br /> 3 • • •• The Pressure Relief Valves shall be visually inspected K)by a SP representative far <br /> determination of Make,Model No.,inlet 5 outlet connections,orifice size, relieving capacity and pressure <br /> setting.The BP representative shall document and record the Pressure Relief Valves data.Date: <br /> Job Representative Signature:Job Rel2dyxj <br /> ll sp ct after work is , /G7 <br /> completed. Job Rep shall sign off eaAPI 653 Inspector Signature:inspectoth a Job Re has signed Date:off the above item [hon Inspector can <br /> 4 The pressure relief system shall consist of one 2"150#RF Flanged Vogt 5 or squall,gate valve and one 1" <br /> 150#RF Flanged Vogt 353,or equal,gate valve. See drawing below. <br /> 5 All pressure relief system ball valves(at test locations)shall be X'Apollo#73-103 series,or equal,carbon <br /> steel threaded ball valves <br /> 6 All pipe and nipples shall be Schedule BO A-106.6 carbon steel pipe.All fittings;i.e.elbows,unions,lees, <br /> couplings,sackolels,inserts,plugs;shall be 3,000# Socket-Weld,Forged Steel,A-105 with socket weld <br /> connections. <br /> 7 All pressure relief piping and fittings shall be socket welded.except for the pressure relief valve connection <br /> which shall be screwed in the existing piping.All threaded connections shall be cleaned and male threads <br /> wrapped with 5 to 7 wraps of Teflon tape.The wrapped threads shall also be coated with a quality thread <br /> IubricanUsealant. <br /> 8 The 2 flanged nozzle connection to the lank shall be installed in accordance with API-650 Figure 5-8.The <br /> nozzle neck shall be welded on both inside and outside of the lank shell utilizing E7018 electrodes. <br /> g. Paint shall be removed from the area where cut out is to be made. <br /> 10. The lank shell out out shag match that of the male size with proper allowance for weld fit-up in accordance <br /> with the approved welding procedure.The nozzle shall be inserted into the shell hole so that the nozzle is <br /> Flush with the internal srrrtase of the tank shell All ii Orin watch shall ha blend,round to avoid damage <br /> to the floatin roof seals.The nozzle shall be lacked in place <br /> 17 • • •• The fit-up of the nozzle shag be visually inspected by a SP representative for compliance WIM <br /> the approved welding procedure. /d5. � t Date: <br /> Job Representative Signature:Job Rad� fler work Is <br /> completed. Job Rep shall sign off ea hAP16531nspector Signoture:Inspectoa eJob Re I,as signed Dato%�off the above item then Inspector can Cy/ / /^/ <br /> 12. The noale-to-shell weld shall be a minimum full penetration and comple f Sion tri full fillet weld all around <br /> utilizing E7018 electrodes. <br /> 13. Nuzzle-10•Sheit Weld Testing and Inspection. <br /> a. • • •• The interior weld final pass shall be visually Inspected(VT)by a DP representative. <br /> Date: <br /> Job Representative Signature:Job Rep shall s Ily f act after work is <br /> completed. Job Rep shall Sign eR each day <br /> Apt 653 inspector Signature: Inspector atfv nfy that Job Rep (signed Date; <br /> off the above item then Inspector can .0 of <br /> b. • s •• The exterior wall(nal pass shall be visually inspecle ( )by a BP representative. <br />
The URL can be used to link to this page
Your browser does not support the video tag.