Laserfiche WebLink
RA <br /> `F-a'' <br /> Ll <br /> VIP <br /> New Pipe Support <br /> (ITEM 11 /CODE 5) <br /> 1 There is a 2"check valve connected the bottom inlet gate valve with a threaded Flange.The piping to these <br /> valves has no support The threaded flange shall he seat welded and a new pipe support shall be fnslalled as <br /> shown below. <br /> 2 The flange threads shall be cleaned and prepared for welding.The flange to pipe juncture shall be seal <br /> welded with a minimum pt2 pass and no more than 3 passes full.`illetweld all a-ound utilizing E6010(root) <br /> and E7018(cap 8 FII)electrodes. <br /> 3. Pipe Weld Testing and Inspection. <br /> a • r '• The weld root pass she I be visually inspected(VTI by a SP representative. <br />