Laserfiche WebLink
Job Representative Signature:Job Rp{shad visually inspect after work is / <br /> completed Job Rep shall sign off y ch d`ydf acceptable. <br /> / L/ <br /> API 653 Inspector Signature:Inspector shall verify that the Job Rep has signed Date: <br /> off the above item then Inspector can signeff. <br /> i <br /> b. P r r�'• t The weld Gnal pass shall pri 6ualad(VT)by a BP representative. <br /> // �� <br /> Date:Vi <br /> Job Representative Signature:Job Re hall isually inspect after work is Vit( <br /> completed Job Rep shall sign off e h da d acceptable <br /> API 653 Inspector Signature:Inspector shall verify that the Job Rep has signed Date: <br /> off the above item then Inspector can signofl. <br /> C, • r •• The completed welds shall be Dye Pe 1 em' (PT)by NDE contractor and <br /> witnessed by a BP represenlatWe. {9 n' i U <br /> Job Representative Signature:Job Rep shall visua1f ns cCa ter work is Date: <br /> completed Job Rep shall sign off each day if acc to e <br /> API 653 Inspector Signature: Inspector shall perform required NDE if acceptable Date: <br /> then it can be sign off. <br /> 4. The piping shall be hydrotested to 1.6 limes maximum operating pressure. The piping shall be drained and <br /> blown c a#er the fast. <br /> 5. • • •• The piping she[' be hydrotested by repair contractor ander essy�by a BP representative. <br /> Job Representative Signature:Job Rep shall visually inspect ft wyr J� Data: 6��[/ <br /> completed. Job Rep shall sign off each day if acceptable / <br /> API 653 Inspector Signature:inspector shall perform r uire NDE if acceptable Date: <br /> then it can be sign OR. <br /> 6, A new pipe supped shall be installed on the'piping'side of the valve and check valve.The adjustable pipe <br /> support shall be fabricated from A-36 material.The support shall include a threaded rod with double locking <br /> nuts. <br /> 7. Al2'diameter reinforced concrete pipe support shall be installe approximately 6'above grade and <br /> extending to a depth of approximately 24" The 3,000 psi con a sup rt shall be reinforced with s 4-#4 <br /> vertical bars and a#3 spiret reinforcement @ 6'spacing <br /> 6 • r . The pipe support shall be visuaily mspect2 representative / <br /> Date: <br /> Job Representative Signature:Job Rep shall is Ily i pect after work is <br /> I. cce ale. <br /> completed .ob Rap sign off each day i } �� <br />