My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
q, • • •• A71 welds shell be Dye Penelran g nedby a BP represenlative. /�/u <br /> Job Representative Signature:Job Rep sh f isuaC sp after work Is Data: <br /> completed. Job Rep shall sign off eacl� y a e ab <br /> API 653 Inspector Signature:Inspecto/shallrm r arfpqui od NOE it acceptable Date: <br /> then it can be sign off. ! / iC{ 10/10 <br /> 5 • . •• The completed work shall be visually(VT)inspected by a IV representative. <br /> Dale: <br /> Job Representative Signature:JobRep shat ually pec after work is <br /> completed. Job Rep shall sign if <br /> eac� Jec le. <br /> /17/,) <br /> API 653 Inspector Signature:Inspector pally nfythatlhe JobR peas Signed Date: <br /> off the above it..then Inspector ca sign�t� 7 S 6/-7//0 <br /> r � e..wr.w.a•no-. <br /> Lab <br /> 41-f-i <br /> rov <br /> r•ms sxi�sv6ltl CnesVtpet <br /> Miscellaneous Fixed Roof Repairs <br /> Gauge Hatch Repairs (ITEM 141 CODE 5) <br /> 1. The existing gauge hatch Is missing a seal.A new compatible seat shall be installed in the gauge hatch or the <br /> oxistino hatch shall be removed and replaced with a new hatch included a seal. <br /> p, • • •• The completed repair shall be visually inspected by a BP representative. <br /> Date: <br /> Job Representative Signature:Job Rep shall i ally i ct ter work is J <br /> completed Job Rep shall sign off each da if cce la %p <br /> til/ G <br /> i <br /> API 553 Inspector Signature: I,U clor hall erlfy in t he Job Re has signed Data: <br /> off the above item then Inspector cap sign f ! /7-M <br /> Tank <br /> Tank Gauge System(/& High Level Alarm ystem Repairs <br /> Tank Gaune System Repairs =c <br /> '}--� ;;��??++ <br /> L— <br /> l I Il I 'd 11- i,A° `'� w r c I}Iib' p o 'I) <br />
The URL can be used to link to this page
Your browser does not support the video tag.