My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
API 653 inspector Signature: Inspector shall verily that the Jab Rep has signed Date: <br /> off the above item then Inspector emi signoff. <br /> i <br /> g . r -• - The completed installation shall he visual) !,n..pe4. <br /> ta a BP representative. <br /> Date:/J/Job Representative Signature:Job Rep sh v'Sual(1t after work is �i` / !�completed. Job Rep shall sign off each day' ac"p <br /> AN 653 Inspector Signature:Inspector shalt verify that the Job Rep has signed Date: <br /> off the above item then Inspector can signoff. <br /> ri <br /> � w <br /> :f -wEPHeIE <br /> m' <br /> EM5ECGFG PV.rf OR <br /> smucnsK sreFl ��. . <br /> Painter's Hitch <br /> (ITEM 15/CODE 5) <br /> 1. The fixed mine roof hes one painter s hitch that is attached to a circular steel plate that is bolted to the roof <br /> plate The existing painter's hitch,circular steel prate and attachment bolls shall be removed and replaced <br /> with two(2)approved hitches as shown below.One(1)new hitch shall be Installed in the center of the roof <br /> and the other new hitch shall be installed approximately 3'in a radial direction away from the center of the <br /> tank roof. <br /> 2. The existing bolt holes shall be plug welded or patched at the discretion of the contractor. <br /> 3 Patches shall be a 1/4"thick minimum 6"diameter A-36 plate seal welded all around with a full and complete <br /> 3/16"Bllel weld. <br /> 4 A standard API 650 Figure 5-22.4"painters hitch shall be installed near the center of the cone roof. <br /> 5 Theamlhitch shall be installed with approved fliet welds utilmng E7018 electrodes, <br /> ers <br /> 6. • r '• All welds shall be visually inspecled(VT71dy a BP representative. <br /> Date: <br /> Job Representative Signature:Job /yrReps�o isu Rer work is <br /> m <br /> copleted Jab Rep shall sign orf eacl+ I �c�� <br /> API 653 Inspector Signature: Inspa.�r%heI verify that the Jab Rep ssigned (Date: <br /> Date- <br /> off the above item then Inspector:yawn sig,:off. �� <br /> ?�fL�Ll t��'��` I�'• ��^. �1�1�.11_ - LL// r� r (aSJ r t (�_F <br />
The URL can be used to link to this page
Your browser does not support the video tag.