My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. The wing handrail shall be as specified and shown below. <br /> a. Handral Height 42• <br /> b. Handrail Posts 2-112'x 2-112'x 114'Angle,A-36 ®96or cess <br /> C. Top rail and Midrail 2.112"x 2-112'x 114"Angle,A-36 <br /> d. Midrail 2-12'x 114'Flat Bar,A-35 <br /> e. Tceboard 114"x 4"Flat Bar,A-36 <br /> 5. A minimum 6"diameter x%"A36 bearing pad shall be Installed and seal welded at all connections to the tank <br /> roof. <br /> 6. • • -• All completed welds shall be visually i. petted(VT)by a BP representative. <br /> Date: <br /> Job Representative Signature:Job Rep a vi y Inspect after work Is / / <br /> completed, Job Rep shall sign off eac d if ep ble 4r1 �U <br /> API 653 Inspector Signature:Inspe ors all verify that the Jo Rep has}igned pat <br /> off the above item then Inspector an gnoff 2 t�r�t� / /—r//D <br /> 7 • • •• The completed repair shall be visually inspected(VT) <br /> byla B'P/rePfXesstimatiivye.// / <br /> Date: <br /> Job Representative Signature:Joh/Rh/!IW/nsp..tet atter work is <br /> completed. Job Rep shall sign offnAPI 653 Inspector Signature:Inspet the Joh ep 5signedOnto:aft the above i!em[hen Inzpector <br /> !/¢-t��n��til• 1 /('—///,T/�'... <br /> Tki--•. <br /> „' _ 1—.Ire•a yr <br /> ASG CLAt£ <br /> _ .S/1' <br /> T—lel[ <br /> t!i-CLEAR Y'%1l0'0.i6 rCAtE / <br /> 6'GUHEPE IN• <br /> f]a ChGS <br /> Fixed Roof Handrail Repairs (ITEM 181 CODE 4) <br /> 1 The existing fixed roof handral s are bo ted to the lop angle. The south and west handrail posts have base <br /> holes that are open to the tank which permits emissions to leak out and moisture to penebale inside Tie <br /> existing handrails shall be modified to replace all the bolted bearing pads on the bottom of the handrail posts <br /> with new lAw thick minimum 6'diameter A-36 pale that is seal welded all around with a full and complete <br /> 3116'fillet weld.The new bearing pads snalf be sized and positioned to wmpictcly cover any existing boll <br /> holes lhrounh the roof plate or the lop angle <br /> 2. • • • • All compioled welds shall be visually inspected(VT)by a BP representative ' <br /> I)Li-)TJ4� �a..it.`� ."A. .J'C�. <br />
The URL can be used to link to this page
Your browser does not support the video tag.