My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i. The lower 36 of the internal shell and the bottom shall be coated with 24 mils DFT Sherwin W:Iliams Dum- <br /> Plale UHS Tank Lining System.Refer to the attached Sherwin Williams"Insfaliation Procedure for Dural- <br /> Plat e UHS Epoxv"for recommended preparation and appiicatios procedures. <br /> 2 The BP representative shall arrange to have an independent NACE Level lf/Iast)"fOrPreS@nt t0 <br /> ins act the surface preparation,coating application and coating curing. <br /> 3 e r "• Verification of independent NACE Level If Inspection witnessed by the BP representative. <br /> Data: <br /> Job Representative Signature:Job Rep shall visually inspect after work is <br /> completed. Job Rep shall sign off each day if acceptable- <br /> API 653 Inspector Signature:Inspector shelf verily that the Job Rep has signed Date: <br /> off the above item then Inspector can signoff. <br /> 4. Tile surfaces and joints to be coated shall be fabricated and prepared in accordance with NACE Standard <br /> RP-0176(Latest Edition) "Design,Fabrication,Surface Finish Requirements and Proper Design <br /> Considerations for Tanks and Vessels to be Lined for Immersion Service." <br /> a. All rough welds shall be ground to remove sharp edges undercuts,pinholes and other such <br /> irregularities.Chipping can be used to remove sharp edges if followed by grinding. <br /> b. Sharp edges and fillets shall be ground to a smooth radius of 1/4'to 116" Surfaces shall be free of <br /> gauges,deep scratches,slivered steel and other surface flaws. <br /> C. Surfaces to be lined shall be free of wax or grease penal:marks,gouges,handling marks,deep <br /> scratches,metal stamp marks,silvered steel or other surface Ilaws.Any flaws shall be repaired by <br /> solvent cleaning,weldng with E70181 E7024 or grinding as required <br /> d All welds to be lined shalt meet the minimum requirements of MACE Weld Preparation Designation "C" <br /> as defined in NACE RP-0178. <br /> 5. Prepare the surface for application of the Internal coaling <br /> a. Remove all oil and grease from surface by Solvent Cleaning per SSPC-SP1. <br /> b. Sandblast tank bottom and lower shelf to Near While Metal Blast Cleaning SSPC-SPI01 NACE 2 <br /> Blast dean all surfaces using a sharp,angular abrasive for optimum surface profile,2-3 mil profile <br /> c Remove all weld splatter.The surface to be primed must be clean,dry,and in sound condition <br /> Remove all 04 dust,grease,dirt,loose rust,and other foreign material to ensure good adhesion <br /> d Clean sandblast material and other debris from prepared surface.Remove and dispose of waste <br /> malarial in approved containers. <br /> e. Prime an bare steel the same day as It is cleaned or before gash rusting occurs. <br /> f • • - Verification of the visual examination(VT)surface preparation Is to specified surface <br /> finish,clean inass,dryness,and readiness for application or the coaling by the BP representative <br /> Date: <br /> Job Representative Signature:Job Rep shy 'sualllrnspect after work is <br /> completed Job Rep shall sign off each flab <br /> API 653 Inspector Signature:fnspc:lor she:verify that the Job Rep has signed Date: <br /> off the abovr item then Inspectori.an signoff <br /> 6 The BP representative shall verify that the installation conforms to the General Requirements of the <br /> 'lnslarkatlon Preg—adare for Dur-Plate U.YS Eaorv. <br /> a. Temperature,air movement,relative humidity and dew point <br /> b. Material handling,storage and preparation <br /> - Observance of all safety precautions.• • •• <br /> 7 Verification of the compliance with all General Requirements by the SP representative <br />
The URL can be used to link to this page
Your browser does not support the video tag.