Laserfiche WebLink
E&ITakhograg <br /> p Tank Return to Service Checklist <br /> aP us P�6nesa tatelkr <br /> (CHECKS MADE PRIOR TO FILLING THE TANK) <br /> OwnerlLoOation Stockton BP <br /> Tank Number: 7 <br /> Loeafion: Stockton Ca <br /> A TANK INTERIOR INITIALS CHECKS <br /> 1 All nozzles&internal piping are free of debris(gloves,weld rod,etc) es No NIA <br /> 2 Visual inspection of tank bottom indicates bottom is tree from hum Ihmughs,aro-stokes yes No NIA <br /> coating damage,etc? <br /> 3 Undarelde of ficating roof Indicates roof is free tram dents Or damage caused by repairs? Yes NoN/A <br /> 4 Fba6ngmofsealsaminmctandimm�clpmition? Yes No N/A <br /> 5 All temporary brackets removed? V. No NI <br /> s Cables,chains etc for roof dams&floating suction are property attached? Yes NoN?A <br /> B TANK EXTERIOR INITIALS CHECKS <br /> I If Dike wells have been wt,they have been returned to original height&.n satisfactory Yea Ne N/A <br /> condition? <br /> 2 Dike drain valve is closed or open to accordance with facility operating practices? es No N/A <br /> 3 Material&debris from cleaning&repairsremoved from dike area? /Y�e^�/sF� We NIA <br /> 4 Cathodic Protection connected&operating? � On NIA <br /> 5 Ground Cables)at base of tank Installed&continuity tested? 79 No NIA <br /> 6 Tank Data Plate Installed Yes No <br /> 7 Mixer(s)Installed Stomp Yes_ No NIA <br /> 6 Tank Valves in proper position,sealed or locked if regaled? Sea Y r No NIA <br /> i 9 Pressure Relief system is in tact&operable? Sea Y No NIA <br /> T to Water Drew Valve(s)Checked&lo closed position? Sin: Yes No �NIA <br /> 1I Roof Vents are dear operational Yes No L'_T <br /> 12 If insulating flanges are used,check that tank is electrically isolated from piping. Yes No !A <br /> 13 Gauge system assembled&functional es No NIA <br /> 14 Law Level switch is checked and opemhng cmrecUy? `Yes No WA <br /> 4 15 High High Level switch is checked and operating correctly? Ves No /A <br /> 16 Other Instmmenlation operating correctly?(list type) V getj L Yes No N/A <br /> 17 Tank Foam piping&chambers are flow tested and OK? Yea No <br /> is Mamvay coversmetalled w/new gaskets&boils tightened severely? Yes No NIA <br /> p 19 Roof Drain Valve dosed? Yes No MIA <br /> O EFR or CONE ROOF INITIALS CHECKS <br /> 1 Roof Marrvvays Gasketetl 8 Bolted Down? Yee' No MIA <br /> 2 Roll.ng Ladder Bonded to shag&floating rod and corrtnulry tested? y Yes No LN'/A'r1 <br /> 3 Circulation Vents Clwed? I Yes No W <br /> 4 Emergency Ovedrow Neale on double deck roof is labeled.clear of obsWctions and fitted yes No <br /> with coned mesh screen? <br /> 5 Bleeder Vents Closed? Yes Na Y NIA <br /> Page 1 of 2 <br />