My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6' Coating shall be applied la BP painting specificallon BPPL-SP-102,system 1 or 2. <br /> 7. Damaged/failed areas of the lank coaling shall be recoaled: <br /> a. Remove all oil and grease from surfaces by Solvent Cleaning per SSPC-SP1 <br /> b. Abrasive blast the areas to Commercial Blast Cleaning SSPC-SPG I NACE 3. <br /> c. The surface to be primed must be clean,dry,and in sound condition.Remove all oil.dust,grease,dirt, <br /> loose rust,and ether foreign material to ensure good adhesion.Prime any bare steel the same day as it <br /> is Weaned or before!lash rusting occurs. <br /> d- Clean abrasive blast material and other debris from prepared surface.Remove and dispose of waste <br /> Tetanal in approved containers. <br /> e. � • • • Verificalfun of the visua/.f.. <br /> T) ace preparation is to specified surface <br /> finish.cleanliness,dryness,and readi �f '�coat by the BP representative. <br /> Date: <br /> Job Representative Signature:Job Repnspect after work is /�completed. JbRepshagsignoffeach, ble. <br /> APE 653 Inspector Signature: Inspector shall verify that the Job Rep has signed Date: <br /> off the above Item then Inspector can signoff <br /> B. Roller apply the coating to the recommended film thickness and allow to dry property.The completed coaling <br /> shell be visually examined(VT)and dry film thickness sh a measured. <br /> n, • r -• Verification of th visual examine (VT) ,oaling application and Dry Film Thickness <br /> measurement by the BP represenlalive. <br /> Date: <br /> Job Representative Signature: Job Rep s/,f <br /> al rnsp¢c[alter work is L <br /> // / <br /> completed. Job Rep shall sign off each dptable <br /> API 653 Inspector Signature:Inspector shall verify that the Job Rep has signed Date: <br /> the above dem then Inspector can signoff.. <br /> Attachments <br /> 1. 13PPL-SP-102 Painting of Tanks.Station Appurtenances and Aboveground Piping <br /> 2. Sherwin Williams Inslallal'on Procedure for Dura-Plate UHS Epoxy <br /> 3. Sherwin Williams Technical Data Pages for STP 06-104 Tank Urong Specifications <br /> 4. Excerpts from NACE RP-0478 <br />
The URL can be used to link to this page
Your browser does not support the video tag.