My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2151
>
3500 - Local Oversight Program
>
PR0544592
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 3:50:49 PM
Creation date
6/21/2019 1:20:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544592
PE
3526
FACILITY_ID
FA0009449
FACILITY_NAME
COUNTRY CLUB TIRES AND MUFFLER
STREET_NUMBER
2151
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308030
CURRENT_STATUS
02
SITE_LOCATION
2151 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 3 <br /> Mike Infurna [EH] <br /> From: Mike Infurna [EH] <br /> Sent: Friday, October 02, 2009 4:23 PM <br /> To: 'Tim Cuellar' <br /> Subject: RE: Blvd. Auto DPE Feasibility WP <br /> ok, <br /> let me see if I understand this. Your/AGE's Jan 9, 2009 work plan is the result of <br /> the Nov 2008 meeting we all had here, right? <br /> The EHD (Nuel, and my signature) repsonded to this in our March 23, 2009 letter. <br /> Three pages of words and NO real, <br /> " you are approved to pilot test DPE" any where in there. right? <br /> So, what happened to the work plan I directed to be submitted by April 3, 2009? as <br /> noted on page 2 of 3, last sentence of paragraph 3??? just when are you planning <br /> on addressing the plume delineation to the NW? <br /> Margaret and i just went thru the notes and letter and she and I DON'T agree with <br /> your understanding that the PILOT test was 'inferred' to be approved. She knows, <br /> and so do I, that AGE's idea of DPE is not like the real world's idea of Dual Phase <br /> Extraction, as in dual (two) types of extraction, like GWE AND SVE....based on this <br /> we're not too gungho with it being used here w/o proof of it working ANYWHERE. <br /> she's leaning to waiting for proof this (AGE's idea of) DPE stuff works... <br /> All of the world outside AGE appears to think of DPE as a method of 'multiple' <br /> extraction. as in dropping a GROUNDWATER extraction well down a GWE well <br /> and pulling out enough water to affect a DTW change thereby increasing the <br /> vadose for more exposure and vadose extraction by a SVE well. dual extraction. <br /> After visiting Nomellini today for their DPE start up tests, it became apparent to me <br /> that the plan there isn't to drop a GWE pump down a gw/gwe well and suck out <br /> gw. It appears the plan here is to suck major volumes of AIR (like 22 inches of <br /> Mercury) from a well just above the DTW, in this case from "EW-1", and having a <br /> unit set up to separate out the gw that comes with the air. <br /> first big difference I see is the amount of water being extracted. much lower <br /> volumes of gw are extracted and it appears that the gw isn't the target effluent. <br /> With such little, incidental gw coming out, how can the vadose be increased? as a <br /> matter of fact, water came UP the casing at Nomellini's today... <br /> Is this your plan at Blvd? <br /> or do you plan to put in a Grunfos/GWE pump into the DPE water well you're <br /> proposing and do you plan to pull out boo-coo amounts of gw with hopes of <br /> 10/5/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.