My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2151
>
3500 - Local Oversight Program
>
PR0544592
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 3:37:01 PM
Creation date
6/21/2019 1:36:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544592
PE
3526
FACILITY_ID
FA0009449
FACILITY_NAME
COUNTRY CLUB TIRES AND MUFFLER
STREET_NUMBER
2151
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12308030
CURRENT_STATUS
02
SITE_LOCATION
2151 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In-Situ Chemical Oxidation Feasibility Study Work Plan <br /> BOULEVARD AUTOMOTIVE SERVICE <br /> 2151 Country Club Drive, Stockton, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.0. SITE REMEDIAL FEASABILITY STUDY HISTORY . . . . . . . . . . . . . . . . . . . . . 1 <br /> 3.0. ISCO REMEDIAL ALTERNATIVES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 3.1 . EXPLANATION OF IN-SITU CHEMICAL OXIDATION. . . . . . . . . . . . . . . 2 <br /> 3.1.1. Hydrogen Peroxide/Modified Fenton's Reagent. . . . . . . . . . . . . . . 2 <br /> 3.1.2. RegenOxT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 3.1 .3. Oxygen Release Compound Advanced. . . . . . . . . . . . . . . . . . . . . 3 <br /> 4.0. SELECTION OF REMEDIAL TECHNOLOGY & SCOPE OF WORK. . . . . . . . . 4 <br /> 4.1 . ISCO PILOT TEST. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 4.2. REPORT PREPARATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 5.0. FIELD PROCEDURES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 5.1. ISCO SOLUTION PREPARATION AND INJECTION PROCEDURE. . . . 6 <br /> 5.2. PROGRESS/CONFIRMATION/COMPLIANCE MONITORING AND <br /> SAMPLING. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 5.3. EQUIPMENT DECONTAMINATION.. . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> FIGURES <br /> Figure 1 - Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 - Dissolved Gasoline-Impact Cross Section A-A' <br /> Figure 4 - Hydrocarbon-Impacted Soil Plume Cross Section A-A' <br /> Figure 5 - Hydrocarbon-Impacted Soil Plume Cross Section B-B' <br /> Figure 6 - Hydrocarbon-Impacted Soil Plume Cross Section C-C' <br /> TABLE <br /> Table 1 - Summary of Monitoring Well Details <br /> Table 2 - Ground Water Monitoring Results <br /> Table 3 - Grab Ground Water Analytical Data <br /> Table 4 - Analytical Results of Soil Samples <br /> APPENDICES <br /> Appendix A - Monitoring and Sampling Procedures <br /> Ad..n need GroEn,immnw.W,I nc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.