Laserfiche WebLink
DEC 09 '94 02:57PM FUGP0 WEST ROSEVILLE P.4/7 <br /> iNeh 6eMce ibbn IWIC Na <br /> 35750wntry Cluh,6ledaoi,Ol�ia ,.. 1_'. . <br /> The progress and scope of work proposed in this workplan may change due to <br /> unforeseen events and site conditions encountered during the field work. Shell and <br /> Fugro's primary objective for this scope of work is hydrocarbon mitigation. All field work <br /> and reporting will be conducted according to the California "LOFT" Manual and the "Tri- <br /> Regional" guidelines. <br /> The information contained within this workplan reflects our professional opinions and was <br /> developed in accordance with currently available information, and accepted geologic, <br /> hydrogeologic, and engineering practices. This workplan was prepared for the use of <br /> Shell Oil Company. <br /> Any reliance on this workplan by parties other than Shell Oil Company shall be at their <br /> own risk. The proposed work described in this workplan will be performed under the <br /> review and supervision of the professional geologist, registered with the State of <br /> California, whose signature appears below. <br />