Laserfiche WebLink
C A M B R I A <br /> We will await your response to this proposed calibration program If we have not received a response <br /> from you by March 21 2003, we Ail] caucel the calibration appointment for March 25, 2003 and <br /> proceed according to our proposed calibration program <br /> CLOSING <br /> The signed certification statement is included as Appendix D Thank you for your assistance with this <br /> project Please call Cynthia Vasko at (510) 420-3344 if you have any questions <br /> Sincerely, <br /> Cambria Environmental Technology, Inc <br /> Cynthia Vasko <br /> Senior Staff Engineer <br /> Attachments <br /> Table 1 Groundwater Extraction System Analytical Results <br /> Appendix A Groundwater Extraction System Certified Analytical Reports <br /> Appendix B Flow Totalizer Calibration Results <br /> Appendix C LEL Meter- Manufacturer's Calibration Recommendations <br /> Appendix D Certification Statement <br /> cc Karen Petryna, Shell Oil Products US <br /> Mike Infur ia, San Joaquin County Environmental Health Department <br /> 0783 3 <br />