My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003533
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2900 - Site Mitigation Program
>
PR0541989
>
ARCHIVED REPORTS XR0003533
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 8:29:56 PM
Creation date
6/21/2019 3:56:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003533
RECORD_ID
PR0541989
PE
2950
FACILITY_ID
FA0024100
FACILITY_NAME
COUNTRY CLUB VALERO
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12302012
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jeff Granberry <br /> September 26, 1995 ( 9447-8620) <br /> Wells MW-1 and RW-1 were decommissioned by pressure grouting the wells with neat <br /> cement up to approximately 12 fbg Prior to grouting, the bottom of the wells were Knocked out <br /> using the slide hammer on the drill rig After the grout was placed, the well casing was extracted <br /> using the rig's winch The boring was covered and secured until the area was overexcavated <br /> The well destruction permit is included in Appendix G <br /> 3.2 UST Removal Compliance Sampling <br /> Following removal of the four USTs and overexcavation to limits proposed in the Soil <br /> Management Plan, dated March 8, 1995, Fugro personnel collected 19 soil samples under the <br /> direction of a SJCPHS/EHD representative The samples were collected at depths ranging from <br /> 11 5 to 19 fbg The excavation sample locations are shown on Figure 3 The laboratory reports <br /> and chain of custody forms of soil samples collected from the former UST excavation are <br /> included in Appendix C and are summarized in Table 5 <br /> Excavation of the new UST basin (Figure 3) began on May 8, 1995 During excavation, <br /> PID readings of the soil removed suggested the presence of petroleum hydrocarbons Soil <br /> samples were collected from the stockpile under the direction of a SJCPHS/EHD representative <br /> On May 15 and 16, 1995, the product line trenches were overexcavated Fugro personnel <br /> collected 17 soil samples under the direction of a SJCPHS/EHD representative: The excavation <br /> sample locations are shown on Figure 3 The laboratory reports and chain of custody forms of <br /> soil samples collected from the former product line trench excavation are included in Appendix <br /> C and are summarized in Table 5 <br /> 3.3 Hand Augered Boning <br /> On June 7, 1995, Fugro hand angered one soil boring HA1 to 6 fbg This boring was <br /> drilled at the approximate location of the product line excavation sample PE8-1 5 to determine <br /> the vertical extent of indicated petroleum hydrocarbons in this location This boring was located, <br /> advanced, and sampled under the direct supervision of Ms Meays of the SJCPHS/EHD No <br /> boring log was prepared <br /> 3.4 Labointory Analysis <br /> Selected soil samples collected during this investigation were delivered under chain-of- <br /> custody to a state-certified laboratory The analyses performed and their practical quantification <br /> limit (PQL) are as follows <br /> Total petroleum hydrocarbons, as gasoline(TPH-G), by modified EPA Method 8015 [PQL <br /> = 1 0 part per million (ppm)] <br /> Benzene, toluene, ethylbenzene, and total xylenes (BTEX), by EPA Method 8020 (PQL <br /> • = 0 005 ppm) <br /> 94478620 ARP 7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.