Laserfiche WebLink
Mr.Michael Infurna,SJCEHD April 7,2006 <br /> Well Installation Work Plan <br /> Palisades Station No. 835, Stockton,CA <br /> Page 11 <br /> If you have any questions or comments concerning this Work Plan, please contact Gowri <br /> Kowtha at(530) 676-6001. <br /> Sincerely, <br /> 57'RATUS ENVIRONMENTAL, INC. �� <br /> N..C �� <br /> M. s <br /> Scott G. Bittinger,P.G. ®o <br /> wri . Kowtha,P.E. OF Cwof <br /> Project Geologist Project Manager <br /> Attachments: Table 1 Drilling and Well Construction Summary <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Extended Site Plan <br /> Figure 4 Site Vicinity Map <br /> Figure 5 Geologic Cross Section A to A' <br /> Figure 6 Geologic Cross Section B to B' <br /> Figure 7 Groundwater Analytical Summary,4th Quarter 2005 <br /> Appendix A Field Practices and Procedures <br /> cc: Mr. Charles Miller, Palisades Gas and Wash <br /> Mr. James Barton, Regional Water Quality Control Board <br /> Ms. Jennifer Sedlachek, ExxonMobil <br /> Mr. Ted Moise, ETIC Engineering, Inc. <br /> KAUSA Gasoline\0835\Work PlanApalisades835 workpl=2006.doc STRATUS <br />