Laserfiche WebLink
Mr.Michael Infuma,SJCEHD November 18,2011 <br /> Well Destruction Report Project No.2007-0835-01 <br /> Former Palisades G&W Station No.835,Stockton,California <br /> Page 2 <br /> November 14 and 17, 2011. A total of 23 wells (MW-1 through MW-2 1, VEW-1, and <br /> VEW 3) were destroyed. Each well was overdrilled using 8-inch hollow stem augers (2-inch <br /> diameter wells) or 10-inch diameter hollow stem augers (4-inch diameter wells). Following <br /> overdrilling, each well was backfilled to surface grade with neat cement. After curing of the <br /> cement,the ground surface was patched to match the surrounding area. <br /> Soil cuttings and wastewater generated during work were containerized in 55-gallon steel <br /> drums,properly labeled, and stored at the site pending disposal. A sample of the soil cuttings <br /> was collected and submitted for laboratory analytical testing. Once the laboratory results are <br /> received, the material will be profiled into an appropriate acceptance facility. Integrated <br /> Wastestream Management (IWM) of San Jose will be retained to transport the drummed <br /> material offsite for disposal. <br /> Following completion of the work, Stratus submitted well destruction forms to the California <br /> Department of Water Resources (DWR) on behalf of All Well Abandonment, Inc. Copies of <br /> these forms will be provided to SJCEHD upon request. <br /> CLOSING <br /> It is our understanding that upon completion of well destruction activities, PG&W has <br /> satisfied all of the requirements pertaining to the environmental issues for the subject <br /> property. On behalf of PG&W, Stratus is thus requesting that the open environmental case(s) <br /> for the subject property be closed, and a No Further Action Required(NFAR)letter be issued. <br /> If you have any questions or comments concerning this report, please contact Scott Bittinger <br /> at(530) 676-2062. <br /> D G�Ca <br /> Sincerely, <br /> STRATUS ENVIRONMENTAL INC. Lx^, <br /> e <br /> 77 <br /> 1'C,,A <br /> Cody Menefee Scott G. Bittinger, G. <br /> Staff Engineer Project Manager <br /> Attachments: Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Appendix A Well Destruction Permits and Encroachment Permits <br /> cc: Mr. Charles Miller, Palisades Gas and Wash <br /> Mr. Jim Barton, California Regional Water Quality Control Board <br /> KAUSA Gasoline\0835\Reports\palisades-835-well destruction report.doc 5T9ATU5 <br />