Laserfiche WebLink
1.011,I31ppg <br /> �" Li Soil Sam fib <br /> Soil borings and soil sampling will b2 performed under the direction of a Delia.ngineer or beolog9at. <br /> The soil borings will be advanced using a truck-mornted hollow-stem auger drill rig. <br /> To reduce the chances of cross-contamination between borchoies,all downhole drilling equipment will <br /> be steamed-cleaned between each boring. To reduce cross-contamination between samples, the <br /> split-barrel sampler will be washed in a soap solution and douLfe-rinsed between each sampling event <br /> Soil sampling will be done in accordance with <br /> _ ASTM 1586-84. Using this procedure, a'2-inch <br /> outside-diameter split-barrel sampler or a 2-inch inside-diameter California-type sampler is driven into <br /> the soll by a 140-pound weight falling 30 inches, After an initial set of b incrs,the number of blows <br /> required to drive the sampler an adaittonal 12 inches is known as penetration resistance,or the 'N• <br /> value The N vat4e is used as all empirical measure of the relative density of cohesionless soils and the <br /> consistency of cohesive soils. <br /> The sampler will be fined with three 2-inch diameter.6-inch long bass tube;. Upon recovery,a portion <br /> Of the soil sample will,be placed into a soil sample col.LXtion jar and sealed for later screening with a <br /> photoionization detector(PIIS). Anotherphrtion of the snit sample.will be used for classification <br /> description. The soil sample collected in the lower most brass tube within the California-type samp!and <br /> will be capped,packaged,and preserved according to Ircepted EPA procedures for possible laboratory <br /> analysis. <br /> 1.2 Soil Classinestion <br /> As the samples are obtained in the field,they will be classified by the crew chief/geologist in accordance <br /> with the United Soil Clissification System (USCS). Representative portions of the samples will be <br /> retained for further exam <br /> iVation and for verification of the field classification. Logs of the borings <br /> indicating the depot and identification of the various strata, the N value, arid pertinent information <br /> regarding the n.ethod of maintaining and advancing the borehole will be made. - <br /> 1.3 Soil Sample Screenlq hNu Portable Photoionizsr(ion Detector Method <br /> : The portion of the sotl sample retained for organic vapor screening will be placed into a Clean <br /> _- ---_--___---sail sample coliection jar;-Each jar will be filled approximately one-half full Ihcn the mouth of the jar. <br /> - - — <br /> will be covered with aluminum foil and dapped with a lid. Jars wig be placed put of direct sunlight for. <br /> at least 20 minutes,allowing time for the air in headspace and soil to equilibrate. The probe of the PID <br /> will be inserted through the aluminum foil,and the highest obsei,�ed reading recorded oil the soil boring <br /> log. : <br /> 1'� <br />