Laserfiche WebLink
43330 Cameron Park Drive Ste 550 <br /> Cameron Pork California 95682 <br /> (530)676-6004-Fax (530)676-6005 <br /> nc) � June 17, 05 <br /> � Project No 2QQ7-Q835-5-01 <br /> w 3 0 L00� <br /> Mr Michael J Infuma Jr ENV11[A6114ME4T HEALTH <br /> San Joaquin County PEHMITf SE"CE5 r <br /> Environmental Health Department <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202 <br /> Subject Site Investigation Work Plan <br /> Palisades Gas and Wash Station No 835 <br /> 2705 Country Club Boulevard <br /> Stockton, California <br /> Dear Mr Infurna <br /> Stratus Environmental Inc (Stratus) has prepared this Site Investigation Work Plan (Work <br /> Plan), on behalf of Palisades Gas and Wash (Palisades), for Station No 835 (the site), <br /> located at 2705 Country Club Boulevard, Stockton, California (see Figure 1) In a letter <br /> dated April 8, 2005, San Joaquin County Environmental Health Department (SJCEHD) <br /> requested that a work plan be submitted, on behalf of Palisades, to further characterize <br /> the extent of subsurface petroleum hydrocarbon impact previously identified beneath the <br /> site <br /> This Work Plan proposes the advancement of seven cone penetrometer test (CPT) <br /> borings, and the collection of depth discrete soil and groundwater samples adjacent to <br /> these borings, to further characterize the lateral and vertical extent of petroleum <br /> hydrocarbon impact to soil and groundwater Details associated with completing the <br /> additional assessment activities, and a rationale for completing the proposed work, are <br /> presented in this document <br /> SITE DESCRIPTION <br /> The site is an active service station and car wash located in a mixed residential and <br /> commercial neighborhood, at the northwest corner of the intersection of Ryde Avenue <br /> and Country Club Boulevard The site operated as an Exxon-Branded service station <br /> (No 7-3708) until November 1995 New West Petroleum operated the service station <br /> between November 1995 and November 1997, Palisades purchased the property from <br /> • New West Petroleum at this time <br /> K\USA Gasoline\0835\Work Planslpahsades835 workplan 06-17-05 doc <br />