Laserfiche WebLink
Mr Michael lnfurna, SJCEHD June 17,2005 <br /> Site Investigation Work Plan <br /> Palisades Station No 835, Stockton, CA <br /> Page 8 <br /> If you have any questions or comments concerning this Work Plan, please contact Gown <br /> Kowtha at (530) 676-6001 <br /> Sincerely, <br /> STRATUS ENVIRONMENTAL, INC <br /> " Np.C <br /> Sto sov-1, �� <br /> CrAt <br /> Scott G Bittinger, P G awn Kowtha, P E <br /> Project Geologist roject Manager <br /> Attachments Table 1 Drilling and Well Construction Summary <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Extended Site Plan <br /> Figure 4 Site Vicinity Map <br /> . Figure 5 Geologic Cross Section A to A' <br /> Figure 6 Groundwater Analytical Summary Map, 4th Quarter 2004 <br /> Figure 7 TPHG, MTBE, TBA Concentration Variation With Time in <br /> Groundwater, Well MW-4 <br /> Figure 8 MTBE, TBA Concentration Variation With Time in <br /> Groundwater, Well MW-7 <br /> Figure 9 TPHG, MTBE, TBA Concentration Variation With Time in <br /> Groundwater, Well MW-8 <br /> Figure 10 TPHG, MTBE, TBA Concentration Variation With Time in <br /> Groundwater, Well MW-10 <br /> Figure I 1 TPHG, Benzene, MTBE, TBA Concentration Variation <br /> With Time in Groundwater, Well VEW-3 <br /> Appendix A Field Practices and Procedures <br /> cc Mr Charles Miller, Palisades Gas and Wash <br /> Mr James Barton, Regional Water Quality Control Board <br /> Ms Jennifer Sedlachek, ExxonMobil <br /> Mr Ted Moise, ETIC Engineering, Inc <br /> K\USA Gasohne\0835\WOrk Plans\pahsades835 workplan 06-17-05 doe STRATUS <br />