My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0003353
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
3500 - Local Oversight Program
>
PR0544595
>
ARCHIVED REPORTS XR0003353
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 11:46:03 AM
Creation date
6/24/2019 11:01:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003353
RECORD_ID
PR0544595
PE
3528
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (Shell) 68221(WRR 6290)
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
02
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date November B. 2005 <br /> • <br /> PALISADES GAS AND WASH STATION NO. 835 <br /> QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 835 Address 2705 Country Club Boulevard, Stockton, California <br /> Palisades Gas Project Supervisor Charles Miller <br /> Consulting Co/Contact Person Stratus Environmental, Inc 1 Gown S Kowtha, P E <br /> Consultant Project No 2007-0835-01 <br /> Primary Agency/Regulatory ID No Michael J Infurna, Jr, San Joaquin County Environmental Health <br /> Department/ Site No 1072, RO No 1504 <br /> WORK PERFORMED THIS QUARTER(Third 2005) <br /> 1 Stratus monitored groundwater elevations and collected groundwater samples from wells MW-1 <br /> through MWA0, VEW-1, and VEW-3 on September 28, 2005 <br /> 2 Stratus compiled and evaluated r <br /> p a ua#ed g oundwater monitoring data <br /> 3 Stratus directed the advancement of borings CPT-1 through CPT-7 between September 6 and <br /> September 9, 2005 <br /> WORK PROPOSED FOR NEXT QUARTER (Fourth 2005) <br /> • 1 The next sampling event is tentatively scheduled for December 2005 <br /> 2 Groundwater samples will be collected for laboratory analysis from wells MW-1 through MW-10, <br /> VEW-1, and VEW-3 Groundwater samples will be analyzed at a state-certified analytical laboratory <br /> for total petroleum hydrocarbons as diesel (TPHD) and as gasoline (TPHG) by EPA Method <br /> SW8015BIDHS LUFT Manual, and for benzene, toluene, ethylbenzene, total xylenes (BTEX), methyl <br /> tertiary butyl ether (MTBE), tertiary amyl methyl ether (TAME), ethyl tertiary butyl ether (ETRE), <br /> di-isopropyl ether (DIPS), tertiary butyl alcohol (TBA), 1,2-dlchloroethane (1,2-DCA), methanol, and <br /> ethanol by EPA Method SW8260B <br /> 3 Stratus will submit the findings of the CPT investigation within a Site Conceptual Model Report <br /> Current Phase of Project Monitoring <br /> Frequency of Groundwater Sampling All Wells= Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Groundwater Sampling Date September 28, 2005 <br /> Is Free Product(FP) Present on Site NA <br /> Approximate Depth to Groundwater 6 30 to 8 82 feet below top of well casing <br /> Groundwater Flow Direction Northeast <br /> Groundwater Gradient 0 0018 ft/ft <br /> K\USA Gasoline\0835\Quarterly\20051USA_835_3Q05 DOC 5TRATU5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.