Ms Marla Guensler <br /> Exxon Company, U S A <br /> June 8, 1995 <br /> Page 2 <br /> Table 2 Ground water samples collected from monitoring wells MW-1, MW-2, and MW-4 through <br /> MW-8 did not contain detectable concentrations of petroleum hydrocarbons A dissolved benzene <br /> isoconcentration map based on analytical results for ground water samples collected on April 5, 1995, <br /> is included as Figure 4 Copies of the laboratory analytical reports are presented in Enclosure B <br /> Extended Air Sparging Test <br /> On March 13, 1995, an extended air spargmg test was initiated in ground water monitoring well <br /> MW-3 and is anticipated to operate for four months The test introduces compressed air into ground <br /> water monitoring well MW-3 at 15 pounds per square inch (psi) at a flow rate of approximately 5 <br /> cubic feet per minute (cfm) <br /> During the test, monitoring wells MW-1, MW-4, MW-5, and MW-6 are utilized as observation wells <br /> to measure the effects of air sparging. Dissolved oxygen and carbon dioxide are measured in ground <br /> water samples collected from air sparging well MW-3 Oxygen content and the lower explosive limit <br /> (LEL) are measured from air samples collected within the well casing above static water These <br /> samples are measured using a LEL meter Pressure readings are collected from the observation wells <br /> using a magnehelic gauge temporarily attached to the well heads <br /> Additional ground water samples were collected from monitoring wells MW-1, MW-3, MW-4, <br /> MW-5, and MW-6 on March 31, 1995 to assess the effect of the ongoing air sparging test being <br /> performed at the site These samples were also submitted to Sequoia for analysis of BTEX and TPH <br /> as gasoline Analytical test results are summarized in Table 2, and copies of laboratory analytical <br /> reports are presented in Enclosure B The extended air sparging test will continue through July 1995 <br /> Upon completion a report will be prepared and submitted for agency review <br /> Future Work <br /> The next quarterly monitoring event for this site is scheduled for July 1995 In addition, the extended <br /> air sparging and soil vapor extraction test will continue until Julie 15, 1995 <br /> Remarks/Signatures <br /> The interpretations contained in this report represent our professional opinions, and are based in part <br /> on information supplied by the client These opinions are based on currently available information <br /> and are arrived at in accordance with currently accepted hydrogeologic and engineering practices at <br /> this time and location Other than this, no warranty is implied or intended <br />