Laserfiche WebLink
SS E C 0 R <br /> Additional Site Assessment and Site Conceptual Model <br /> 7-11 Store#14117 <br /> September 30, 2005 <br /> Page 5 <br /> site (SECOR, Conceptual Site Model, Chevron 9-4054 2903 Country Club Boulevard, <br /> Stockton, California, May 14, 2003) These fluctuations appear to result in a net zero <br /> gradient over an extended period of time (SECOR, Additional Site Assessment Report and <br /> Fate and Transport Model, February 27, 2004) <br /> 2 2.2 Groundwater Use <br /> Groundwater provides approximately 22 percent of the water supply and is used <br /> extensively as a source of drinking and irrigation water (USGS, 1996) <br /> 2 3 Surface Water <br /> The following three surface water bodies are located within one mile of the site (Figure 1) <br /> ® Calaveras River 4,500 feet to the northwest <br /> * Smith Canal 1,300 feet to the south-southeast <br /> The Stockton Deep Water Channel of the San Joaquin River 3,000 feet to the <br /> southwest <br /> 2.4 Local Land Use <br /> Land use in the area is primarily commercial to the south and east Residential property is <br /> located to the north and west of the site <br /> 2 4.1 Aerial Photograph Review <br /> SECOR did not conduct an aerial photograph review for this report <br /> 2 4.2 Topographic Map Review <br /> SECOR reviewed the United States Geological Survey (USGS) 7 5 Minute Quadrangle <br /> topographic map of West Stockton, California to identify physiographic features such as <br /> streams, lakes, site development, and vicinity development No lakes or streams other than <br /> the three noted in section 2 3 are evident within one mile of the site <br /> 3 0 PREVIOUS INVESTIGATIONS <br /> On July 17, 1998, three 10,000-gallon single-walled USTs were removed from the site The <br /> UST excavation was extended to the east, and two new 10,000-gallon double-walled steel <br /> USTs were installed The new tanks were installed in a tank pit located east of the original <br /> UST locations One ten-inch diameter Schedule 40 polyvinylchloride (PVC) conductor <br /> casing was installed in the new UST pit between the new tanks for future installation of well <br /> MW-2 <br /> On September 29 and October 2, 1998, Fluor-Daniel GTI advanced six offsite (OSGP-1 <br /> • through OSGP-6) and 11 onsite (GP-7 through GP-17) Geoprobe® soil borings (Table 2 <br /> and Figure 2) The offsite borings were located north of the 7-Eleven site in an apartment <br /> I W-Elevenk7-11 Stores1141171Reports114117 SCM and Additional Assessment doc Page 5 <br />