Underground Storage Tank Removal Report and Wait Plan for Additional Site Investigation 3 <br /> Southland Store#14117 2725 CountEy Club Boulevard Stockton CallfomEa September 29 1 ggg <br /> modified and the oxygenates TBA, MTBE, DIPE, ETBE, and TAME by EPA method 8260 In addition, <br /> one sample (1W-W)was analyzed for total lead by EPA method 6010 <br /> 3.2 Results of the Soil and Groundwater Sample Analysts <br /> Laboratory analytical results of soil and groundwater samples collected July 17, 1998 are summarized <br /> in Table 1, and copies of the analytical data are included in Appendix C <br /> ' The highest benzene and TPH-G concentrations in the soil were detected in sample TC-2-14' <br /> p , <br /> ' collected beneath the south end of the center UST, at 63 milligrams per kilogram (mg/kg) and 7,200 <br /> mg/kg, respectively The highest MTBE concentration in sod by EPA 8260 were detected in sample <br /> TW-2-14', collected beneath the south end of the western UST, at 40 mg/kg TAME was detected in <br /> sample TW-2.14' ata concentration of 2 mg/kg TBA, DIPE, ETBE, and total lead were not detected in <br /> the samples analyzed <br /> The highest dissolved benzene and TPH-G concentrations in groundwater were detected in sample <br /> TW-W collected beneath the western UST at 5,000 micrograms per liter (pg/L) and 140,000 jug/L, <br /> respectively The highest MTBE, TBA, and TAME concentrations in groundwater were detected in <br /> sample TW-W at 68,000 pg/L, 23,000 pg/t., and 1,200 pg/L, respectively Total lead was also detected <br /> in sample TW-W at a concentration of 0 82 milligrams per liter(mg/L) DIPE and ETBE were not <br /> detected in the three analyzed groundwater samples <br /> 4 0 TANK PIT EXCAVATIONIBACKFILLING!DEWATERING <br /> 1 <br /> 4 1 Tank Pit Excavation and Backfilling <br /> ' Following removal for the three 10,000-gallon USTs the tank it w <br /> p as excavated to a depth of 14 feet <br /> BGS generating approximately 40 cubic yards of soil The soil was stockpiled on site pending <br /> characterization and disposal The additional 40 cubic yards of soil was removed from the floor of the <br /> tank pit excavation for compaction purposes and to allow for the placement of coarse gravel fill <br /> ' material The tank pit excavation was backfilled with gravel from 14 feet BGS to 9 feet BGS and with <br /> sod from the new tank pit excavation from 9 feet to 2 feet BGS <br /> 14117usi rpt <br /> FLUOR DANIEL GTI <br />