Laserfiche WebLink
SITE CONCEPTUAL MODEL AND REMEDIAL ACTION PLAN g <br /> 16 7-Eleven Store No 14117,2725 Country Club Blvd , Stockton, CA June 20 2002 <br /> 52 Installation Costs <br /> ' Installation costs Include treatment compound construction and installation, subsurface installations <br /> (system piping and utilities hookup), design drawings Including electrical one-line diagrams, utilities <br /> deposits, applicable permitting costs, fees, and permit Inspections Installation costs Include all <br /> ' subcontractor fees and oversight charges System startup and trouble-shooting are also Included In costs <br /> for system installation Installation costs for excavation Include short-term rental of excavation equipment, <br /> ' shoring, dewatering, and waste disposal of excavated soils and dewatering waste <br /> Costs Include all subcontractor fees and oversight charges System installation costs range between <br /> $80,000 to over$300,000 (with permits Included), Including remediation system treatment wells <br /> 53 Monthly O&M Costs <br /> ' Operation and maintenance costs include monitoring of influent and effluent concentrations and flowrates <br /> as required by operating permits Also Included is checking system function and adjusting flowrates and <br /> ' intake levels as necessary to optimize system performance and efficiency Laboratory charges for <br /> analysis of samples to ensure permit compliance, utility costs, technical oversight of system operation, <br /> M and costs to prepare reports as required for the various regulatory agencies having jurisdiction over <br /> system operation and site remediation are also part of routine operation/maintenance Monthly operation <br /> and maintenance costs also Include disposal costs of used materials, and routine equipment maintenance <br /> and minor repairs <br /> I <br /> The unit cost per month is estimated to be about$5,000 per month <br /> ' Groundwater monitoring costs are not included in operation and maintenance cost calculations <br /> 54 Life-Cycle O&M Costs <br /> The life-cycle cost of each option represents the combined capital, installation, and monthly operation and <br /> maintenance costs for the total length of remediation, which is assumed for cost comparison purposes as <br /> two years (except for excavation), barring any additional releases Results of total cost comparison (life- <br /> cycle) are shown on Figure 4, Feasibility Cost Comparison <br /> Based on cost and feasibility evaluations, DPEIIB is the most cost-effective feasible alternative, followed <br /> by ASISVE Pilot testing for AS/SVE has not been conducted at this site If the proposed method is not <br /> successful at reaching remedial goals, this treatment alternative may be evaluated as a <br /> ' supplemental/replacement process to the one proposed <br /> 14117Scm2doc <br />