Laserfiche WebLink
r <br /> SITE CONCEPTUAL MODEL AND REMEDIAL ACTION PLAN 10 <br /> 7-Eleven Store No 14117 2725 Country Club Blvd Stockton,CA .lune 20 2002 <br /> ' 60 PROPOSED REMEDIATION METHOD <br /> DPE/IB Is the proposed remediation method at the site based on <br /> rG Documentation of expanding Indigenous microbial populations <br /> ® Reductions in MTBE through presumed biodegradation <br /> ' Fate and transport modeling Indicate low likelihood of offsite plume migration <br /> O Observed pumping Influence during the DPE test indicating a radius of Influence of about 45 <br /> ' feet from the area of extraction <br /> Three additional wells to be located, as shown on Figure 2, are recommended to allow for enhanced SVE <br /> removal of oxygenate/hydrocarbon mass from the former and current tank pit areas The wells are <br /> proposed to be constructed of 2-inch diameter, schedule 40 PVC, screened from 5 to 20 feet bg Sand <br /> filter packing will occupy the annular space to one foot above the top of the screen Interval, sealed with 2 <br /> ' feet of bentonite pellets saturated in place, capped with neat cement to grade At grade, the treatment <br /> wells will be fitted with water-tight caps and boxed In locking, water-tight traffic-rated well boxes <br /> itMobile DPE is recommended Instead of full-time DPE as more cost-effective due to less capital equipment <br /> expense, no GAC changeout costs, and no NPDES permitting requirements Groundwater Is removed <br /> directly from the site for recycling at a licensed disposal facility SVE equipment Is mobile or Is not <br /> required based on exclusion of vacuum trucks from air permitting regulations <br /> ' Intrinsic biodegradation appears to be already occurring, this remediation process may not need further <br /> enhancement Further evaluation of the process is recommended to include HPC testing of all wells at the <br /> site, specific species evaluations via microcosm studies are not recommended at this time due to cost <br /> It is recommended that for the next 6 months remediation will proceed by conducting mobile DPE using <br /> ' well MW-2 and SVE using (on a rotating basis) each of the proposed new wells combined with SVE from <br /> groundwater monitoring wells MW-1, MW-3, and MW-4 Field events are scheduled to occur every 2 <br /> weeks Onsite time is scheduled to be from 8— 10 hours each field event <br /> ' Prior to remediation initiation, all applicable local permits will need to be obtained, including any permits for <br /> well installation, and all required air discharge permits <br /> ' 61 Length of Remediation <br /> After completion of the initial 6 months of operations, groundwater extraction and plume data will be <br /> evaluated to ascertain the effectiveness of the DPE/IB process at removing the majority of the dissolved <br /> hydrocarbon/oxygenate plume At that time, any required modifications to the remediation process will be <br /> evaluated and recommended <br /> r14117Scm2 doc <br /> r <br />