REPORT ON ADDITIONAL SITE ASSESSMENT AND RECOMMENDATIONS 4 <br /> 7-Eleven Store No 14117,2725 Country Club Blvd,Stockton,CA December 12,2001 <br /> ' 34 Groundwater Monitoring Well Installation/Surveying <br /> On October 30, 2001, groundwater monitoring wells MW-5, MW-6, and MW-7 were installed at the <br /> ' locations shown on Figure 2 The groundwater monitoring wells were constructed of <br /> 2-inch-diameter, Schedule 40 polyvinyl chloride casing with flush threads, and 0 020-inch-slot well <br /> screen The well screen was Installed from about 5 to 20 feet below grade In each well Sand was <br /> ' placed in each well annulus from the bottom to approximately 1 foot above the top of the well screen <br /> The well annulus was sealed with approximately 3 feet of bentonite pellets saturated in place on top <br /> of the sand pack, and concrete to approximately 6 Inches below grade The wellheads are protected <br /> at the surface by locking,water4ightwell caps and traffic-rated street boxes (with watertight bolted <br /> lids) set In concrete Well construction details are shown on the drill logs in Appendix A <br /> The top of casing and rim of each well box was surveyed by Morrow Surveying for horizontal position <br /> and elevation relative to mean sea level datum (Appendix B) <br /> ' <br /> 35 Fourth Quarter 2001 Groundwater Monitoring and Sampling <br /> On November 5, 2001, depth to water in each well was measured to the nearest 0 01 foot from the <br /> top of the well casing using an interface probe (Table 2) Field data sheets are provided in <br /> IPAppendix C <br /> ' Subsequent to monitoring, approximately four well volumes of water was removed from each of the <br /> older monitoring wells to ensure stabilization of pH, electrical conductivity, and temperature About <br /> 10 well volumes of water was removed from each of the new wells (MW-5, MW-6, and MW-7) to <br /> ' complete well development The purge water was stored in DOT-approved 55-gallon drums pending <br /> transport and disposal Prior to groundwater purging,dissolved oxygen was measured in each well <br /> ' using a field instrument The groundwater samples were collected using disposable bailers,then <br /> transferred to 40-milliliter glass vials filled to zero headspace and acidified to a pH of 2 The samples <br /> were sealed using TeflonO-septum caps, labeled, placed on ice in an insulated container, and <br /> ' transported under chain-of-custody to a state-certified laboratory for analysis The groundwater <br /> samples were analyzed for BTEX and TPH-G using EPA Methods 8020/modified 8015 Samples <br /> ' were additionally analyzed for TBA, MTBE, DIPE, ETBE, and TAME by EPA Method 8260 (Table 1, <br /> Figure 2) <br /> 1 <br />