Laserfiche WebLink
r <br /> Phase l Update and Pre-Gas Station Phase 11 Report <br /> Proposed Safeway Store#1769 Gas Station <br /> Stockton, California December 12, 2000 <br /> 3.0 PRE-GAS STATION PHASE II SAMPLING <br /> On November 27, 2000, HSI GeoTrans drilled and sampled four soil borings (SB-1 <br /> through SB-4) on the Property. The purpose of the sampling was to obtain a baseline <br /> assessment of soil and groundwater conditions on the Property. The soil borings were <br /> completed to depths of 11 and 16 feet below ground surface (bgs) and soil and <br /> groundwater samples were collected from each boring for possible laboratory analysis <br /> of petroleum hydrocarbon compounds and volatile organic compounds. The four <br /> groundwater samples and the 10-foot soil samples from borings SB-2 and SB-3 were <br /> submitted for laboratory analysis. Boring SB-2 was completed in the proposed fueling <br /> island area and boring SB-3 was completed in the proposed UST(s) location. Depth to <br /> first groundwater was encountered between 10 and 14 feet bgs. Static depth to <br /> groundwater ranged from 8.5 to 12 feet below grade. <br /> No chemicals were detected in the two soil samples. With the exception of the <br /> groundwater sample from boring SBA, chemicals were not detected in the four <br /> groundwater samples. MTBE and xylenes were detected in groundwater at SBA at <br /> concentrations of 8.7 and 2.4 pg/L (ppb), respectively. These concentrations are below <br /> the respective MCL values for MTBE and xylenes of 13 ppb and 1,750 ppb, <br /> respectively. Boring SBA was completed at the northeast corner of the Property within <br /> approximately 100 feet of the nearby 7-11 gas station release site. High concentrations <br /> of gasoline, MTBE and BTEX compounds have been detected in groundwater at the 7- <br /> 11 site. As such, it is reasonable to suspect the MTBE and xylenes detected in <br /> groundwater at SBA are likely a result of the groundwater contamination at the 7-11 <br /> site. The Phase II investigation is discussed in the attached report (Appendix C). <br /> P:IPROJECTSeafeway4284\Stakron-10311789_EA Updele.doc 7 <br />