Laserfiche WebLink
w I4-AZ7101 o:+a--.Nn" rmim 1uI.IG1U!V caLL1- U C: dMd gild boge P.3 <br /> 31 July 1997 <br /> AGE-NC Proposal No. 97-1385 <br /> Page 2 of 6 <br /> excavation.The following items are included in this proposal: <br /> 2.1. PROBING AND SAMPLING <br /> • Preparation of it Work Pian and site specific Site Haeitb and Safety Plank. <br /> • Preparation of drilling pemit and permit fee and Regulatory liaison. <br /> • ,Advancement of six(6)soil prone borings.Probe borings will be advanced to depths of 20 <br /> AeAt bfgow vllrface grade.(bsg)using a vast-mounted probing trait. <br /> • Collcxtiou of soil samples from each probe boring. Samples will be collected at five-foot <br /> intervals or continuously. <br /> • Field screening of soil samples using a photo-ionization detector(PID). <br /> • Collection of grab ground water samples from Leh probe boxing. <br /> • Transmitral of sail and ground water samples to a State-certified laboratory for analysis. <br /> • Analysis of six soil and sic grad water samples. for total petroleum hydrocarbons <br /> quantified as gasoline('T FH-g)and diesel(Tr )as*ell as volatile aromatics(benzene, <br /> toluent,ethyl berumm nerd xylenes: BTfi.&X)w4 methyl tertiary butyl e9w(MTBE)In <br /> accordance with the appropriate EPA methoU Laboratory analysis will be performed on a <br /> five-&y tttm4"und time. <br /> • Infants of the investigation will be inebided in a technical report prepared by AGE. The. <br /> report will include recommendations for additional work,ifnecemary,and will be reviewed <br /> and 15ignP1 by a Registend Geologist. <br /> 2.2. MDNiT ORINO WELL INSTALLATION AND SAMPLING(If Necessary) <br /> If hydrocarbon-impacted ground water is present at the site, the PHS-EHD will require the <br /> installation of ground water monitoring wells.If contaminated ground water is encountered in both <br /> the maintenance and golf cart storage areas,three monitoring wells will be necessary at each site. <br /> IU fbHowing items are included for monitoring well izWAllation: <br /> • Preparation of a drilling peersnit and,permit foe. <br /> • Regulatory liaison with the PHS-EHD. <br /> • Drilling of silt soil borings.Each boring will be advanced to depths of 15 to 20 feet using a <br /> truck-ma%u ,drill rig equipped with 5.25-inch hollow-start ausers. Each boring will be <br /> completed as a 2-inch diameter ground waxer monitoring well. <br /> Aa�et Gaui'.a�teoep�a4 neo , <br />