My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
3800
>
3500 - Local Oversight Program
>
PR0544597
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 5:39:06 PM
Creation date
6/24/2019 2:04:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544597
PE
3528
FACILITY_ID
FA0002327
FACILITY_NAME
STOCKTON GOLF & COUNTRY CLUB
STREET_NUMBER
3800
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
10902006
CURRENT_STATUS
02
SITE_LOCATION
3800 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- o-46J4411.l rKum , ILAy%1LjN LiLl.I- L; U W P.4 <br /> Y <br /> 31 July 1997 Ott <br /> AGE-NC Proposal No. 97-1385 <br /> Page 3 of 6 <br /> • Each boring will be sampled at five-foot intervals using pre-aleaned brass sleeves. The <br /> samples will be logged in accordance with:'the Unified Soil Classification System and <br /> Mierved in accordance with PHS-MW guidelines. <br /> • Soil sample duplicata will be Moa'dt+ored in the 5eld using a photo-iqnWition detector(Pll]). <br /> • Devsiopmar t ofeach monitoring well. Each well wi11 be developed no sooner dm 4s-bours <br /> after completion. <br /> • Swvcying of wells. Each well at dw site will be surveyed relative to an arbitrary benchmark. <br /> • Depth,to ground water measurements in each well at the site(total of S wells). <br /> • Phage each monitoring well of standing water. Stabilization teeters will mer smed <br /> during purging and recorded on field sheets. <br /> • Collection of one.ground water sample from each well. A total of five(S)samples will be <br /> collected. <br /> • Developntaut and purge water will be placed in DOT drwns and stored on-site ponding . <br /> laboratory walysis. <br /> • Analysis of six sail and six ground water sarnples. Ba&sampic will be analysed for TPH-g, <br /> TPH-d,BTE&X and M MF_All samples will be attalyxed by a Stste-ceatified laboratory In <br /> accordawe with the appropriate EPA melho& <br /> 3.0. COST <br /> The total cost for Task 2.1. should rust exceed S5,430.00;ft cost for Task 2.2. should not exceed <br /> M4 M.00.The costs quoted are based on the scopo of work as diacusm d above and on out Standard <br /> SsWule ofChargcs;all costs will bar billed to Ow Clicut-on a time and Materials basis. <br /> The above coat is based upon one day of field work(probing). if additional time is required to <br /> complcbc the proposed scope of wodr.a►11 cltsoMw will be billed on a time and nu serials basis. If <br /> additional prabings can be completed in one day,no additiaW pzb►b m charges will apply_Hov.ever, <br /> comes for addidaasel field supplies,geola$iat's time or laboratory analysis will still apply. <br /> 4.0. PAYMENT SCHEDULE <br /> AGE shall submit detailed monthly invoices,to the STOCKTON<JOLF AND COUNTRY CLUB <br /> for payment.Invoices will specify the actual costs incwred daring the balling period. The invoices <br /> will detail when the services were perfortned end may w4lude a breakdown for direct labor,indkeet <br /> .f�+ur�CasEsvlroanarat�rea. <br />
The URL can be used to link to this page
Your browser does not support the video tag.