My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
3800
>
3500 - Local Oversight Program
>
PR0544597
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 5:39:06 PM
Creation date
6/24/2019 2:04:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544597
PE
3528
FACILITY_ID
FA0002327
FACILITY_NAME
STOCKTON GOLF & COUNTRY CLUB
STREET_NUMBER
3800
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
10902006
CURRENT_STATUS
02
SITE_LOCATION
3800 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�-7ots-1 xi b:4'..7M 1-HUM 51tJLXtUN C"-t- U (.: ZdU 1646 Fes'0f�J V. b <br /> 31 July 1997 DRAFT <br /> AGE-NC Proposal No.97-13$3 <br /> page 4 of 6 <br /> costs,travel,equipment,materials and supplies,and subcontractor savic'4M, <br /> 5.0. ITE—S NOT INCLUDED XN THIS PROPOSAL <br /> The followirm items are not included in this proposal: <br /> regulatory oversight fees,if required. <br /> • Treabnent or disposal of coatan i ted soil arWor groundwater. <br /> • Additional samplft armor analysis,if required by the regulatory agencies. <br /> • Installation of grotrA water monitedng wells or soil boric. <br /> • OeopWcal survey,if to locate underground utilities. <br /> • Other cysts not specif egly stated in this proposal. <br /> 6.0. ASSUMP'I ONS <br /> This proposal assumes the following: <br /> Access to the site will be Secured by the Client; all activities at the site can be performed <br /> timing normal working hours. <br /> • AH costs incurred due to regulatory directives,after this propoW,shall be assumed by the <br /> Client_ <br /> • <br /> Expense inctured bwause of unusual or unanticipatad tround conditions(such as fill,hard <br /> soil,rock,etc.) shall be paid for by tete Client as extra work. <br /> • Regulatory approval of Work flan, <br /> 7.0. SCHEDULE <br /> The work outlmed in this proposal can be initiated upon receip%of audwdzation to proceed&8m <br /> STOC KTON OOLF AND COUNTRY CLUB.AGE will begin work on the proj=within five days <br /> of receipt of authorization to proceed. <br /> .tr1►+aacd c+a��►ea+I4.MMRL Xue. <br />
The URL can be used to link to this page
Your browser does not support the video tag.