Laserfiche WebLink
L.e <br /> CO�tP E'aARi+ht�)qC L �aIES INC <br /> y 1 fi [r +t� lQt Circle Suite I <br /> Stockton CA 95206 <br /> 03 AUG _ "orae 00.234.0518 <br /> FAX 209.234.0538 <br /> CONDOR www.condorearth.com <br /> July 23, 2003 <br /> Ms. Donna Heran <br /> San Joaquin County Environmental Health Department <br /> 304 E. Weber Avenue, 3d Floor <br /> Stockton, CA 95202 <br /> Re: Report for Groundwater Monitor Well Sampling and Groundwater Investigation, <br /> Pilkington North America,500 East Louise,Lathrop,San Joaquin County,California <br /> Condor Project No. 3151J <br /> Dear Ms. Heran: <br /> This is a report of findings for the fieldwork conducted at two Underground Storage Tank(UST) sites at <br /> the above referenced facility (Figure 1, Attachment A). Condor Earth Technologies, Inc. (Condor) is <br /> submitting this report in response to your April .I1, 2003 letter to Mr. Mike Bowles, formerly with <br /> Pilkington North America (PNA). This report includes site background information, a description of the <br /> fieldwork and laboratory analyses, a description of the results of the work, and a summary with <br /> recommendations. The locations of both UST sites are shown in Figure 2, Attachment A. The site of the <br /> 1986 and 1987 UST removals is shown in Figure 3, Attachment A. The site of the 1997 UST removal is <br /> shown in Figure 4, Attachment A. The groundwater gradient measured at the 1986/1987 UST removal <br /> site during the current investigation activities is shown in Figure 5, Attachment A. Field forms completed <br /> during the current investigation activities (boring logs,monitor well sampling forms, and the groundwater <br /> elevation measurement form) are included as Attachment B. Laboratory analytical reports for the soil and <br /> groundwater samples collected during the current investigation activities(analytical result certificates and <br /> chain-of-custody records) are also included as Attachment C. <br /> Your April 11, 2003 letter requested the submittal of a work plan by June 1, 2003 to describe monitor <br /> well sampling at the 1986/1987 UST removal site and groundwater investigation at the 1997 UST <br /> removal site. In response, Condor prepared the Work Plan for Groundwater Monitor Well Sampling and <br /> Groundwater Investigation, dated May 9, 2003, describing proposed procedures for conducting the <br /> requested sampling and groundwater investigation activities. The proposed work included sampling of <br /> monitor wells MW-17 and MW-18 at the 1986/1987 UST removal site and groundwater sample <br /> collection from five direct push borings at the 1997 UST removal site. In a cover letter for the work plan <br /> dated May 28, 2003, Condor indicated that although the work plan described measures for conducting the <br /> requested fieldwork at the site associated with the 1986/1987 UST removal site, Condor was requesting <br /> site closure based on historical soil and groundwater data. In a letter dated June 4, 2003 Ms. Margaret <br /> Lagorio of the San Joaquin County Environmental Health Department (SJCEHD) indicated that the <br /> SJCEHD did not agree with closure of the 1986/1987 UST removal site and the work described in the <br /> work plan was approved. <br />