My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2900 - Site Mitigation Program
>
PR0009276
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 8:43:45 AM
Creation date
6/25/2019 8:17:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0009276
PE
2960
FACILITY_ID
FA0012033
FACILITY_NAME
PILKINGTON NORTH AMERICA
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19812008
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 _ <br /> REPORT <br /> ' STANDBY GENERATOR DIESEL SUPPLY LINE <br /> PRELIl1+I NARY SITE INVESTIGATION <br /> ' Libbey Owens Ford Co. <br /> 500 East Louise Avenue <br /> Lathrop, California <br /> 1 San Joaquin County <br /> 1 Prepared by <br /> CONDOR EARTH TECHNOLOGIES, INC. <br /> ' August 23, 1996 <br /> ' 1.0 INTRODUCTION <br /> ' This site investigation report was prepared by Condor Earth Technologies, Inc. (Condor) at the <br /> request of the Libbey Owens Ford Co. (LOF). The purpose of the investigation was to evaluate <br /> ' suspected leaking underground product piping associated with an above ground diesel tank and <br /> standby generator located at the LOF site (Figures I and 2, Appendix A). <br /> 1 with the San Joaquin County Public Health Services, <br /> All work was conducted in accordance rt q ty <br /> Environmental Health.Division (PHS/EHD), and the California Regional Water Quality Control Board <br /> ' (CRWQCB) requirements. This report includes a description of the fieldwork, laboratory analyses, <br /> 1 product removal, and conclusions. <br /> 2.0 FIELDWORK <br /> 1 2.1 Excavation <br /> The investigation included the excavation of a portion of the underground piping at a jointed <br /> ' section where the leak was most likely to have occurred (Figure 3, Appendix A), Ron Rowe of the <br /> PHS/EHD was notified prior to the fieldwork and was present during the excavation., The excavation <br /> ' work was performed by Erickson Inc., of Richmond, California on July 24, 1996. A Condor geologist <br /> was on site to supervise the excavation and collect soil samples. <br /> 1 <br /> i . <br /> k <br /> CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.