Laserfiche WebLink
Now W <br /> CONDOR EARTH TECHNOLOGIES - Geo I og i co I Log _:aBORING NO GP <br /> PROJECT <br /> 1 OF 1 <br /> ' PROJECT NO 1133B DATE 12/3/96 <br /> PROJECT Libby-Owens-Ford Diesel Supply Line TOTAL DEPTH-15' <br /> ' LOCATION Lathrop, CA HOLE DIAMETER f' <br /> DRILLING CONTRACTOR Vironex HAMMER WEIGHT AND FALL N/A <br /> DRILL EOUIP GeoProbe SURFACE CONDITIONS soil and glass <br /> t DRILLING METHOD Direct Push DEPTH TO STATIC WER "11' <br /> LOGGED BY:Don Kresse <br /> ' DEPTHN G FIELD DESCRIPTION SAMPLE ORGANIC REMARKS <br /> fFT1 u"a 0 7 N a u v VAPORS <br /> J intryl,/ID m u o° x¢ (Ppm) <br /> 10 YO 3P 10 25 m Ts <br /> ' SP/ SILTY SAND brown, � CVA = PID <br /> 1 SM Fine grained: DRILL METHOD = DIRECT PUSH <br /> 2 <br /> 3 Sand & Silty Sand <br /> ' alternating/gradrng 0.5 no odor <br /> 9 no clear horizons GP5-4 <br /> ' 6 <br /> 7 <br /> D a no odor <br /> B SILTY SAND olive brown; GP5-8 <br /> Fine gra+ned, moist <br /> t 9 0.5 no odor <br /> lfl SILTY SAND, dark oh ve; GP5-10 <br /> Fine grained; very murst <br /> ' Silty Sand gradrnn to <br /> 1Z Sandy Silt and back between 12'-15' <br /> 13 <br /> 11 MH SILT brown; medius Plastic <br /> SM 203 moderate odor <br /> 15 SILTY SANG grayoeh olive GP5-15 Water sample 1838-GP5-12/3/9 <br /> collected. Strong odor and <br /> 16 Borehole terminccec at 15'. Free product <br /> Bcrehoie bockPrliev with 9X <br /> ' 17 bentonite/Cement rryTure <br /> ]B <br /> l9 <br /> 1 I <br /> ZZ <br /> 1 � <br /> 29 <br /> 25 <br /> 26 , <br /> 27 <br /> 29 <br /> 3[I <br /> 1 31 <br /> 32 <br /> 33 <br /> ' 39 <br /> 35 <br />