Laserfiche WebLink
1IMF <br /> CONDOR EARTH TECHNOLOGIES - Geological Log PAGE ND G I <br /> PAGE IOF 1 <br /> ' PROJECT NO 1838 DATE 12/9/96 <br /> PROJECT Libby-Owens-Ford Diesel Supply Line TOTAL DEPTH 15' <br /> ' LCCATION:Lathrop, CA HOLE DIAMETER:2" <br /> DRILLING CONTRACTOR Vironex HAMMER WEIGHT AND FALL N/A <br /> DRILL FOUIP-GeoProbe SURFACE CONDITIONS soil and glass <br /> ' DRILLING METHOD Direct Push DEPTH TO STATIC WATER"11' <br /> LOGGED PY Don Kresse <br /> W VOLATILE <br /> DEPTH FIELD DESCRIPTION SAMPLEORGANIC REMARKS <br /> (FT) u i a N o °u v VAPORS <br /> a u 1 intrvl./Itl m u o r x e Ipil <br /> O <br /> LOM 3o V e so n <br /> ' SM OVA = PID <br /> 1 DP GRILL t ETHDQ = DIRECT POSH <br /> 2 <br /> 3 SILTY SAND dark olive, 0.0 slight odor <br /> ' 9 well sorted, moist GP6-9 <br /> 5 <br /> 7 <br /> SILTY SAND: groyish olive: 195 strong odor <br /> 8 some as above GP6-8 <br /> SP SAND: grayish olive; <br /> very Fine to Fine grained: Zia strong odor <br /> 1Q well sorted GP6-10 <br /> ' 12 saturated <br /> 13 <br /> 19 CL SILTY CLAY: grayish olive, <br /> ' medium Plastic 9-C slight odor <br /> ]5 GP6-15 Water sample 1839-GPG-12/9/9 <br /> Borehole terminoted at 15'. collected. Strong odor and <br /> 16 I Borehole bockFilled with 9X Free product <br /> }? _ bentonite/cement mixture. <br /> ' 18 <br /> 19 <br /> zo <br /> z1 <br /> Z2 <br /> ' 23 <br /> 29 <br /> 25 <br /> ' 25 <br /> 27 <br /> Z8 <br /> 29 <br /> 30 <br /> 31 <br /> 32 <br /> 33 <br /> 39 <br /> 35 <br /> 1 <br />