Laserfiche WebLink
i • <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVI <br /> 304 E. Weber Ave.Third Floor WORK P,AN <br /> P.O. Box 388, Stockton,CA 95201 SOH.INVESTIGATION <br /> Phone: (20 r)463'3420 Libbey Owens Ford Co. <br /> (/ 500 East Louise Avenue <br /> �j <br /> L:J Approved Lathrop,California <br /> ❑Approved with changes. See Remark San Joaquin County <br /> ❑ Disappl V'Jel: Prepared by <br /> wino r mOST 94Z CONDOR EARTH TECHNOLOGIES,INC. <br /> Rema,-ks 1�wst a <br /> tJtnr�sE1 8Y S A5 erkb St lte June 20,1996 <br /> Lt> Tpuco ?V4 126 Lt7o1 •03c(2. <br /> Date 1.0 INTRODUCTION <br /> Y This soil investigation work plan was prepared by Condor Earth Technologies,Inc.(Condor) <br /> Approval of these pIL;.ns extends o o that at the request of the Libbey Owens Ford Co.(LOF). The purpose of the proposed work is to <br /> which is shown and de scribed tank <br /> he on but invenigae suspected leaking underground product piping associated with an above ground diesel <br /> does not authorize or approve an ission located at the LOF site(Figures 1 and 2). The product piping is suspected to have leaked due to a <br /> or deviation of requirements of St a aws It recent inventory loss. The proposed work includes the excavation of a portion of the underground <br /> Local Ordinanees• piping atjointe'd sections where the leak is most likely to have occurred. It is anticipated that 50 to <br /> 100 cubic yards of soil will be excavated during the fieldwork:. The excavation equipment and <br /> operator will be provided by Erickson Inc.,of Richmond,California. A Candor geologist will be <br /> present during the fieldwork to observe the investigation and collect soil samples. <br /> All work will be conducted in accordance with the San Joaquin County Public Health <br /> Services,Environmental Health Division(PHSIEHD),and the California Regional Water Quality <br /> Control Board(CRWQCB)requirements. Included in this work plan is a description of the proposed <br /> fieldwork laboratory analyses,and reporting. In addition,a project health and safety plan is attached. <br /> 2.0 FIELDWORK <br /> 2.1 Site Preparation <br /> Underground utilities located within the proposed excavation area will be identified by LOF <br /> prior to the fieldwork. Ron Rowe of the PHS/EHD will be notified of the fieldwork schedule at least <br /> 48 hours in advance. <br /> �� CONWR <br />