Laserfiche WebLink
C � , <br /> T <br /> CONDOR EARTH TECHNOLOGIES INC. <br /> November 23, 1998 1125 N.Golden State Blvd. 188 Frank West Circle <br /> Suite G Suite I <br /> Turlock, CA 95381 Stockton, CA 95206 <br /> (209) 668-9234 (209) 234-0518 <br /> FAX (209) 668-9248 FAX(209) 234-0538 <br /> Mr.Philip Isorena <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, CA 95827-3003 <br /> RE: Field Work Schedule for Standby Generator Diesel Supply Line Product Recovery System <br /> Installation,Libbey Owens Ford Co.(LOF),500 East Louise Avenue,Lathrop,California, <br /> San Joaquin County <br /> Dear Mr.Isorena: <br /> The installation of the product recovery system is scheduled,weather permitting,to commence <br /> on December 7, 1998,at 7 AM,at the above referenced site. Trenching and product recovery well <br /> installation should continue for approximately five days beginning at that time. Monitor well installation <br /> is tentatively scheduled for the following week,after the product recovery system installation is <br /> complete. If there are any questions,please call Mr. Jon Weiss,LOP Environmental Coordinator, at <br /> (209) 858-6202. <br /> Respectfully submitted, <br /> CONDOR EARTH TECHNOLOGIES,INC. <br /> Donald F. Kresse <br /> California Registered <br /> Geologist#6430 <br /> cc: Mr. Jon Weiss,LOF <br /> Mr.Ronald Rowe, San Joaquin County Public Health Services,Environmental Health <br /> Department <br /> P:\1838 LOF Diesel Line\WorkScheduleLIR.doc <br /> ENVIRONMENTAL GEOLOGICAL ENGINEERING GEOTECHNICAL <br /> http://www.condorearth.com <br />