My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2900 - Site Mitigation Program
>
PR0009276
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 10:32:35 AM
Creation date
6/25/2019 8:20:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009276
PE
2960
FACILITY_ID
FA0012033
FACILITY_NAME
PILKINGTON NORTH AMERICA
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19812008
CURRENT_STATUS
02
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\fgarciaruiz
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C � , <br /> T <br /> CONDOR EARTH TECHNOLOGIES INC. <br /> November 23, 1998 1125 N.Golden State Blvd. 188 Frank West Circle <br /> Suite G Suite I <br /> Turlock, CA 95381 Stockton, CA 95206 <br /> (209) 668-9234 (209) 234-0518 <br /> FAX (209) 668-9248 FAX(209) 234-0538 <br /> Mr.Philip Isorena <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, CA 95827-3003 <br /> RE: Field Work Schedule for Standby Generator Diesel Supply Line Product Recovery System <br /> Installation,Libbey Owens Ford Co.(LOF),500 East Louise Avenue,Lathrop,California, <br /> San Joaquin County <br /> Dear Mr.Isorena: <br /> The installation of the product recovery system is scheduled,weather permitting,to commence <br /> on December 7, 1998,at 7 AM,at the above referenced site. Trenching and product recovery well <br /> installation should continue for approximately five days beginning at that time. Monitor well installation <br /> is tentatively scheduled for the following week,after the product recovery system installation is <br /> complete. If there are any questions,please call Mr. Jon Weiss,LOP Environmental Coordinator, at <br /> (209) 858-6202. <br /> Respectfully submitted, <br /> CONDOR EARTH TECHNOLOGIES,INC. <br /> Donald F. Kresse <br /> California Registered <br /> Geologist#6430 <br /> cc: Mr. Jon Weiss,LOF <br /> Mr.Ronald Rowe, San Joaquin County Public Health Services,Environmental Health <br /> Department <br /> P:\1838 LOF Diesel Line\WorkScheduleLIR.doc <br /> ENVIRONMENTAL GEOLOGICAL ENGINEERING GEOTECHNICAL <br /> http://www.condorearth.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.