My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2900 - Site Mitigation Program
>
PR0009276
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 8:51:32 AM
Creation date
6/25/2019 8:26:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009276
PE
2960
FACILITY_ID
FA0012033
FACILITY_NAME
PILKINGTON NORTH AMERICA
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19812008
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Libbey Owens Ford Co. <br /> Product Recovery System Installation <br /> June 23, 1997 <br /> Page-6- <br /> The portable product recovery system will include: (a) one Xitech ADJ 1000 Skimmer, (b) one <br /> portable system platform, (c) one 170 Ib nitrogen cylinder, (d) two, 12 volt batteries for alternating <br /> use, (e) one battery charger, and (f) two DOT approved 55-gallon product storage drums equipped <br /> with high-level shut off capability. System documentation is provided in Appendix B of this work <br /> plan. <br /> 3.4 Operation & Maintenance <br /> Condor will monitor and maintain the product recovery system on a bi-weekly basis (twice per <br /> month). Dunne each visit, depth-to-water and product thickness will be measured in each of the <br /> product recovery wells. The recovery system will be moved periodically to other product recovery <br /> wells, as warranted, based on site conditions. The system pumping rate and pump timer will be <br /> adjusted to optimize recovery. The skimmer screen will be cleaned and maintained periodically in <br /> accordance with the manufacturers recommendations. The product containment drums will be <br /> emptied, as warranted, for offsite product recycling. The power supply (12 volt battery) and nitrogen <br /> gas cylinder will be switched out, as needed. <br /> 3.5 Bi-Annual Reporting <br /> Condor will prepare bi-annual status reports for submission to the PHS/EHD. Prior to <br /> submission, the status report will be presented to LOF for review and approval. The report will <br /> include operational efficiency data, field observations, and total gallons of product removed. All <br /> reports will be endorsed by a registered professional. <br /> 3.6 Decommissioning System <br /> At that time when PHS/EHD concurs that product recovery is no longer necessary, the product <br /> recovery system will be decommissioned. The product recovery wells will be decommissioned by <br /> removing the traffic boxes and the upper 2 feet of well casing. The remaining casing will be tremmie- <br /> grouted with a mixture of cement and five percent bentonite. The area above the remaining well <br /> casing will be backfilled with clean soil. The pea-gravel filled trenches will not be altered. <br /> �� CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.