Additional Monitoring Wells Installation Work Plan <br /> Pilkington North America,Inc. <br /> April 19,2005 <br /> Page 4. <br /> Table 1: Groundwater Monitorin Parameters <br /> Analyte Method Units Container Holding <br /> Time <br /> Nitrate as N 300.0 m 1 Liter 48 hours <br /> TDS 160.1 m Same liter 7 days <br /> H 150.1 pH units Same liter ASAP <br /> Total Coliform Organisms 9221B MPN/100 ml 125 ml sterile 6 hours <br /> 8VOA 14 d <br /> 010 or ays <br /> Trihalomethanes ' 012 µg/L preserved <br /> with HCL <br /> Standard Minerals <br /> Alkalinity SM2320B mg/L 1 Liter for all 24 hours <br /> Std.Minerals <br /> Barium 200.7 m <br /> Calcium 200.7 m <br /> Chloride 300.0 m L <br /> Hardness 200.7 m /L <br /> Magnesium 1 200.7 m <br /> Nitrate 300.0 in <br /> Sodium 200.7 in <br /> Potassium 200.7 in <br /> Sulfate 300.0 mg/L <br /> ' Analysis for trihalomethanes will be conducted if chlorine was added to the wastewater storage pond during the last year. <br /> mg/l=milligrams per liter or parts per million <br /> ifggll=micrograms per liter or parts per billion <br /> I. 5.0 REPORTING <br /> A Monitoring Well Installation Report of Results will be prepared for submittal to the Regional Board <br /> describing the results of the field work. At a minimum the report will include: (1) project background <br /> information, (2) a description of the fieldwork conducted at the Site, (3)the laboratory results (including <br /> a tabular summary and the laboratory analytical reports), (4) a scaled site plan and groundwater contour <br /> map, (5) drilling logs, (6) conclusions, and (7) recommendations. The report will also include a geologic <br /> log and an as-built construction diagram for each monitoring well. Information provided will include the <br /> calculated and actual volumes of the filter pack and annular seal materials used in each well installation <br /> and the surveyed reference point elevation for each well, surveyors notes and other elements listed in <br /> Attachment C of the WDR.. <br /> 6.0 SCHEDULE <br /> Fieldwork will be initiated within approximately 30 days after approval of this work plan by the Regional <br /> Board, subject to the availability of the drilling contractor. Consequently, approval of this work plan by <br /> June 10, 2005 will allow for installation by July 17, 2005. .The field activities and laboratory testing <br /> described can be completed and a Monitoring Well Installation Report of Results prepared and submitted <br /> to the Regional Board within 30 days of receiving laboratory results. <br /> 1 <br /> �.� CONDOR <br />