My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2900 - Site Mitigation Program
>
PR0506293
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 9:04:55 AM
Creation date
6/25/2019 8:55:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506293
PE
2965
FACILITY_ID
FA0016365
FACILITY_NAME
PILKINGTON NORTH AMERICA, INC
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19812008
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Monitoring Wells Installation Work Plan <br /> Pilkington North America,Inc. <br /> April 18,2005 <br /> Page-5- <br /> 7.0 LIMITATIONS <br /> Condor developed the interpretations and conclusions presented herein in accordance with the generally <br /> accepted principles and practice in use at the time the work was performed. Water quality monitoring of <br /> any site is necessarily confined to selected Iocations and may change with time. Conditions may, and <br /> often do, vary between and around these locations. <br /> Condor has endeavored to determine as much as practical about the Site using conventional practices <br /> given our scope of services. Conclusions presented in this work plan are professional opinions based on <br /> limited information obtained at the time of our site visits. If any changes are made or errors found in the . <br /> information used for this work plan, the interpretations and conclusions contained herein shall not be <br /> considered valid unless the changes or errors are reviewed by Condor and either appropriately modified <br /> or re-approved in writing. <br /> Condor's responsibilities discussed in this work plan are limited to observing well installation, collecting <br /> and i recording depth-to-water measurements and field parameters, collecting and shipping samples, - <br /> compiling data provided by analytical laboratories, and interpreting field data. Condor is not responsible <br /> for the accuracy and completeness of information collected and developed by others. This report was <br /> prepared by Condor under the direct supervision of a Registered Engineer in the State of California.Any <br /> questions regarding the content of this document should be addressed to Mr. Jeff Willett at (209) 234- <br /> 0518. <br /> Respectfully submitted, <br /> I CONDOR EARTH TECHNOLOGIES,INC. oQgOFESSIpyq( <br /> AGE A. eft . <br /> e� 4 x <br /> d�' / 5 c oaazss <br /> Kevin Freitas J f tt,6 di CIY1\ NP. <br /> Staff Geologist nglneermg Services Manager 9ff OF CAUE � <br /> r <br /> P:\3000_pd\3151 Pilkinton PLOF\315IN Well Installation\Reports\Work Plans\2005 Well Installation Work Plan.doc <br /> �I <br /> i1� CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.