My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DARCY
>
1501
>
2900 - Site Mitigation Program
>
PR0537563
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2019 12:01:22 PM
Creation date
6/28/2019 4:05:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0537563
PE
2950
FACILITY_ID
FA0021627
FACILITY_NAME
CITY OF LATHROP CROSSROADS WWTP
STREET_NUMBER
1501
STREET_NAME
DARCY
STREET_TYPE
PKWY
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
1501 DARCY PKWY
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 29, 2014 Monitoring Well Abandonment and <br /> Installation Workplan <br /> 2.3. Borehole Logging and Soil Sampling <br /> California Department of Water Resources and San Joaquin County require completion and <br /> submittal of Water Well Drillers' Reports.In the Lathrop area,the near surface deposits are <br /> composed of discontinuous inter-bedded silty sand,sandy silt,silty clay,clay,and sand. <br /> Continuous-core samples will be collected using a split-spoon sampler driven ahead of the <br /> drilling tool.Core samples will be removed from the split-spoon sampler and examined to <br /> describe their texture,moisture content,grain size,and color using the Unified Soil <br /> Classification System.The core samples will be bagged and kept chilled for possible pore- <br /> water extraction. Pore water from select core samples may be extracted using a vacuum <br /> pump and filter,and the electrical conductivity of the pore water measured. <br /> In addition to core sample descriptions,the borehole log will also report any changes in the <br /> drilling rate,caving of the borehole,or changes in water temperature or water levels.All <br /> observations will be recorded and reported on a well boring and construction form. <br /> 2.4. Health and Safety Plan <br /> No hazardous constituents or contamination are expected at the project site locations,and <br /> all work will be carried out in compliance with Occupational Safety and Health <br /> Administration (OSHA) regulations and guidelines.All personnel working at the site during <br /> well construction and destruction activities shall be familiar with these regulations and <br /> guidelines. <br /> The primary physical hazards are associated with the use of the drilling rig and supporting <br /> vehicles.All drillers performing work must possess required C-57 license,and all drill crew <br /> members shall receive site-specific training prior to beginning work.The licensed driller <br /> shall be responsible for the safe operation of the drill rig as well as the crew's adherence to <br /> all safety procedures.The crew members and other personnel at the site shall wear <br /> protective equipment(i.e.,hard hat,gloves,and steel toed boots),and be aware of all <br /> hazards and control procedures.All personnel working at the site shall participate in the <br /> Daily Safety Meetings and be aware of all emergency procedures. <br /> Before drilling,the existence and location of underground pipe,electrical equipment and <br /> gas lines will be determined.Documentation that nearby utilities have been marked on the <br /> ground,and that the drill site has been cleared shall be in the possession of the Field <br /> Operations Manager prior to commencement of drilling at the site.If drilling is conducted in <br /> the vicinity of overhead power lines,the power to the lines must be shut off or the <br /> equipment must be positioned and blocked such that no part,including cables can come <br /> within the minimum clearances of the lines.All well sites will be inspected by the driller <br /> prior to locating the rig to ensure a stable surface exists. <br /> Hydro Focus, Inc. 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.